Published March 4, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to an educational facility in Saint Helens, Oregon. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Hoffman Construction Company, Construction Manager/General Contractor ("CM/GC") for ST. Helens high school addition and renovation ("Project") being performed for St. Helens School District No. 502, a public school district of the State of Oregon ("Owner") requests sub-bid proposals for Bid Package #7 - Selective Demolition Buildings B, C and D. Demolition (includes $50k allowance for T&M work) Replace Building B Partition Walls Enclosed Walkway Between Weight Room and Gym Gym Cooling Remove glued-on vinyl-wrapped wall panels from classroom walls not pink-highlighted on sheets AD2.1B1 and AD2.1B2 The project consists of an addition and renovation to the existing st helens high school in st helens, oregon. the existing campus contains four (4) main buildings, connected with covered walkways and secured with exterior fencing from the rest of the site. the new proposed building infills the spaces between three of those buildings with new construction. other areas of the building will be renovated to varying degrees. the scope of work also includes site improvements, including new play field(s), a new fire access lane, and reconfiguration and/or re-paving of existing parking areas. A completed Subcontractor/Vendor Questionnaire including latest year-end safety and financial information must accompany the proposal unless previously submitted. Questionnaire may be attached as a separate file or submitted separately. Elaborate proposals or the inclusion of non-essential information e.g. marketing/promotional material, safety manuals, resumes, etc. is strongly discouraged. Proposals that are materially incomplete, do not include current Questionnaire with latest year-end safety and financial information (unless previously submitted), are directed to other locations or received after the bid deadline will not be considered. Bidders must be properly licensed with the Oregon Construction Contractors Board ("CCB") at the time of bid. Bidders are required to file a $30,000 Public Works Bond with the CCB in accordance with ORS 279C.836 EXCEPT exemptions allowed under paragraphs (7) or (8) will not be permitted. Due to the scheduled start of the work, the $30,000 Public Works Bond must be on file with the CCB at the time of bid. This is a prevailing wage project. Bidders must comply with requirements of the prevailing wage law in ORS Chapter 279C. A District-Specific Insurance Program ("DSIP") for on-site operations is being provided for general liability. Contractor is committed to promoting and stimulating the growth of disadvantaged business enterprises, minority business enterprises, women business enterprises, emerging small businesses and service-disabled veteran business enterprises (D/M/W/ESB/SDVBE) and maximizing opportunities for these firms, as well as local businesses, to participate in the work of this project. Subcontractor shall endeavor to utilize such firms through sub-tier contracting and/or material purchases and shall provide documentation of their good faith efforts and achievements. Contractor is an equal opportunity employer and request bids from all qualified firms including disadvantaged, minority, women, disabled veterans and emerging small business enterprises. CCB License # 28417.

Post-Bid

Educational

$130,000.00

Public - City

Addition, Demolition, Renovation, Site Work

862

46

3

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Fabricator Qualifications, Installer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber, Wood Decking, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Roof Panels, Siding, Membrane Roofing, Modified Bituminous Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Folding Doors and Grilles, Folding Fire Doors, Panel Doors, Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Library Equipment, Book Theft Protection Equipment, Audio-Video Equipment, Projection Screens, Laboratory Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Special Instrumentation, Stress Instrumentation, Seismic Instrumentation
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Structured Cabling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Screening Devices, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
32
Bidding Soon
579
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

2375 Gable Rd, Saint Helens, OR

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Saint Helens High School Addition and Renovation - Bid Package #7 - Selective Demolition Buildings B, C and D

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.