BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Site work and paving for a road / highway in Largo, Florida. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of March 13, 2025, this project is in the final planning phase. Engineer information has not been determined. Construction is currently anticipated to begin in Summer 2025. 444243-1-52-01 A 12-ft. multi-use path will be constructed along the north side of SR 688 (Ulmerton Road) from Fountain Parkway N to I-275. This path will connect to the multi-use path that will be constructed with the I-275 widening from 38th Avenue N to 4th Street N project (FPID 449109-1-52-01.)

Final Planning

Roads / Highways

$318,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
1
Bidding Soon
906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.