Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Site work and paving for a road / highway in Largo, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Update:https://www.largo.com/Proposed%20FY25-29%20CIP%20Document%20-%20040124.pdf The City's roadway pavement surfaces (280 lane miles) are a vital community asset with a total replacement value of over $60 million. The scope of these projects may include pavement improvements, repairs to sidewalk, ADA curb ramps, stormwater and wastewater infrastructure, and traffic and safety improvements to address speeding, parking, volume, and cut-through traffic. Paving group TR02 consists of 0.68 miles of scheduled pavement improvements. The TR02 area includes Valencia Drive (inclusive of Valencia Drive N, S, E & W) and Madrid Drive. The project scope includes pavement, pedestrian and drainage improvements. Pavement improvement scope consists of full reconstruction. ADA improvements will be evaluated and completed with this project. The drainage infrastructure will be evaluated and required improvements will be addressed. This project includes design with inspection services and construction. Project is included in City of Largo Fiscal Year 2025-2029 Page no 143 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The City's roadway pavement surfaces (280 lane miles) are a vital community asset with a total replacement value of over $60 million. The scope of these projects may include pavement improvements, repairs to sidewalk, ADA curb ramps, stormwater and wastewater infrastructure, and traffic and safety improvements to address speeding, parking, volume, and cut-through traffic. Paving group TR02 consists of 0.68 miles of scheduled pavement improvements. The TR02 area includes Valencia Drive (inclusive of Valencia Drive N, S, E & W) and Madrid Drive. The project scope includes pavement, pedestrian and drainage improvements. Pavement improvement scope consists of full reconstruction. ADA improvements will be evaluated and completed with this project. The drainage infrastructure will be evaluated and required improvements will be addressed. This project includes design with inspection services and construction. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$2,097,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Oakdale Ln S, Largo, FL
Related To This Project
Largo, FL
Bid Date: Nov 07 2025
Largo, FL
Bid Date: Apr 10 2025
Largo, FL
Bid Date: Apr 09 2025
Largo, FL
Bid Date: May 23 2025
Largo, FL
Bid Date: Mar 26 2025
Largo, FL
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
