Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Renovation of a water / sewer project in Largo, Florida. Conceptual plans call for the renovation of a water / sewer project.
Update:https://www.largo.com/Proposed%20FY25-29%20CIP%20Document%20-%20040124.pdf A number of the Wastewater Reclamation Facility (WWRF) sanitary sewer lift stations are in the flood plain. Continuity of operations of these lift stations is at risk during high rain and/or flooding events. This project included a consultant Preliminary Engineering Basis of Design in FY 2019 and a consultant design in FY 2020 to raise critical infrastructure above the flood plain at Lift Stations 19, 26, 41, and 47. Additional funding is needed for Lift Station 19 and 26 relocation(s). This includes funding for additional Resident Project Representation (RPR) services, the replacement of a segment of failing pipe upstream of Lift Station19 and design and permitting services for it as well. Also, Lift station 38 has been identified as the City's next focus to relocate wastewater pumping facilities to the 500-year floodplain. During a 2023 storm event, Lift station 38 encountered at least 6-inches of flooding with its adjacency to Allen Creek. Lift station 38 provides wastewater services to approximately 190 residential properties. Relocation of the lift station will improve resiliency for this community's wastewater system throughout the design life of the new lift station. Project is included in City of Largo Fiscal Year 2025-2029 Page no 128 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A number of the Wastewater Reclamation Facility (WWRF) sanitary sewer lift stations are in the flood plain. Continuity of operations of these lift stations is at risk during high rain and/or flooding events. This project included a consultant Preliminary Engineering Basis of Design in FY 2019 and a consultant design in FY 2020 to raise critical infrastructure above the flood plain at Lift Stations 19, 26, 41, 47. Construction and construction inspection services for one lift station are scheduled for FY 2023. The remaining three lift stations are scheduled for construction in FY 2024. Mitigation of flood plain risk not only ensures continuity of lift station operations, but it also reduces risk of sanitary sewer overflows. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$8,665,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
To Be Determined, Largo, FL
Related To This Project
Largo, FL
Bid Date: Nov 07 2025
Largo, FL
Bid Date: Sep 17 2025
Largo, FL
--
Largo, FL
Bid Date: Apr 29 2025
Largo, FL
Bid Date: Jun 30 2025
Largo, FL
Bid Date: Apr 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.