BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2024 at 7:00 PM

Updated September 28, 2024

This is a service / maintenance or supply contract in Gardner, Kansas. Contact the soliciting agency for additional information.

https://www.emporiagazette.com/free/article_56a7aa1e-db0e-11ee-9d09-239f763a8434.html Gardner Municipal Airport – $798,500 __________________ The City of Gardner is soliciting Statements of Qualifications from airport consultants for Terminal Building Design and Construction Administration at the Gardner Municipal Airport (K34) located on the western edge of Gardner, Kansas. Project funding is dependent upon the successful future receipt of federal funding under the FAA Airport Improvement Program (AIP), Bipartisan Infrastructure Law (BIL) Program, and/or Kansas DOT Funding Programs. The Airport Capital Improvement Plan (ACIP) was prepared with the assistance of H.W. Lochner, Inc. and preliminary terminal building design was completed by GLMV Architecture Design and Construction Administration Services to be provided may include, but are not limited to, final environmental evaluations, final building and site design, contract document preparation, bidding, construction observation, and special services such as geotechnical/subsurface investigations and topographic surveying. The completed terminal building preliminary design services have provided conceptual building design, including floorplan, site plan and related cost estimates, topographic land survey, geotechnical report and boring logs, and NEPA evaluations. In accordance with FAA Advisory Circular 150/5100-14E: 1) the qualifications-based selection process will be utilized to select a consultant; and 2) the agreement(s) between the sponsor and selected consultant shall be subject to all applicable Federal Rules and Regulations. A final scope and associated fee will be negotiated with the selected consultant. Fee information shall not be submitted with Statements of Qualifications as fees will be negotiated upon availability of federal funding for projects. The selection committee will rate the Statements of Qualifications according to the following criteria: 1) Capability to perform all aspects of the project. 2) Relevant experience of key personnel from prime firm (and subconsultants, if any) and role. 3) Knowledge of FAA standards, polices, and procedures. 4) Recent experience with comparable projects at similarly sized airports. 5) History of timely service delivery and meeting budget parameters. Prospective firms are advised that applied overhead rates must conform to the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. The successful firm will be required to submit a copy of the current overhead rate audit certification. Statements should be concise and shall contain no more than twenty-four (24) pages of material (12 sheets, doublesided). This excludes the front and back covers; the cover letter (maximum two (2) pages), table of contents, section dividers, and resumes. Submissions must include five (5) hard copies and one (1) PDF of the Statement of Qualifications.

Post-Bid

Transportation Terminals

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
0
Bidding Soon
666
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

July 21, 2023

Project location map

31905 W 175th St, Gardner, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.