Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 3, 2023 at 8:00 PM
Updated April 10, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Desoto, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
**As of May 3, 2023, project was awarded to Gershenson Construction Co., Inc., awarded amount is $2,646,730.25.** Bridge replacement at three locations Armbruster Rd. over Haverstick Creek; Doss Hollow Rd. over tributary to Plattin; & Harness Rd. over tributary to Hocum Hollow. The existing structures are considered structurally deficient. The proposed Armbruster Rd. structure is a pre-stressed concrete I-Girder Bridge will be 35' wide x 6 1' long. The proposed Doss Hollow structure is a pre-stressed NU-Girder Bridge that will be 35' wide by 90' long. The proposed Harness Rd. structure is a pre-stressed concrete I-Girder Bridge that will be 35' wide by 70' long. All bridges will include: Removal of existing bridges, New bridge abutments, reinforced concrete decking, concrete bridge approaches, horizontal and vertical alignment improvements, new revetment rock lining the creek banks to prevent erosion, and guardrail. Roadway work will be necessary to tie-in grades and the existing roadway. The total length of Armbruster Rd. Bridge is 292', Doss Hollow Rd. Bridge is 400', & Harness Rd. Bridge is 575'. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2022 Edition. The contractor questionnaire must be on file 7 days prior to bid opening.
Award
Bridges / Tunnels
$2,646,730.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2023
May 15, 2023
Multiple Locations, Desoto, MO
Related To This Project
Desoto, MO
Bid Date: Apr 04 2023
Desoto, MO
Bid Date: May 26 2023
Desoto, MO
Bid Date: May 25 2023
Desoto, MO
Bid Date: Jul 13 2023
Desoto, MO
Bid Date: Aug 03 2023
Desoto, MO
Bid Date: Jul 26 2023
Desoto, MO
Bid Date: Aug 10 2023
Hermann, MO
Bid Date: Feb 24 2023
Kansas City, MO
--
Jefferson City, MO
Bid Date: Mar 15 2023
Kirksville, MO
--
Kirksville, MO
--
Kirksville, MO
Bid Date: Nov 12 2019
Kirksville, MO
--
Kirksville, MO
Bid Date: May 07 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
