BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in State College, Pennsylvania. Completed plans call for the construction of a 9,400-square-foot educational facility; for site work for a educational facility; warehouse / distribution facility; and warehouse / distribution facility.

*Bid Results Poole Anderson was not the low bidder on this project Construct a new Facility to house the University's Chemical and Radiation Waste Stream. Question Deadline 03/06/2023 The Bidder shall submit all questions, clarifications, bid document discrepancies or omissions via the eBuilder Q&A Board within the Bid Package All construction shown on the contract drawings and not expressly mentioned in the specifications and all work specified and not shown on the drawings, but obviously necessary to the proper execution of same, shall be performed by the Contractor, as it is not the intent to delineate or describe every detail and feature of work. No additions to the contract sum will be approved for any materials, equipment, and/or labor to perform work hereunder unless it can be clearly shown to be beyond the scope and intent of the drawings and specifications and absolutely essential to the proper prosecution of the work. C. Work under this contract consists of the complete construction work and includes, but is not necessarily limited to, the furnishing of all labor, superintendence, material, tools, and equipment necessary to complete all the work as shown on the contract drawings and as specified hereinafter. H-02 Work By Others A. Epoxy Floor System B. Lab Equipment & Casework C. Office & Locker Room Furniture D. Permanent Transformer Procurement and Installation. *Addendums 1, 2, 3, 4 & 5 have been released. *The Design Team and PSU have been made aware that the Clean Agent Fire Protection System as specified in the documents is not compatible with Oxidizers, Explosives, Organic Peroxides, and Pyrophoric chemicals. Contractors are to bid the project as currently design and specified. The Design Team and PSU will work with the awarded Contractor to create a Fire Protection System for these chemicals that meet code and safety requirements.

Bid Results

Warehouse / Distribution

$10,407,000.00

Public - State/Provincial

New Construction, Site Work

161

32

106

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
20
Bidding Soon
422
All Active Projects
165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

May 15, 2023

img_map_placeholder

To Be Determined, State College, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.