EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Malta, Illinois. Completed plans call for the renovation of a educational facility.

Roof Replacement Project at Malta Elementary School SCOPE:Bids will be received for all Flooring Replacement Work. ACCESS TO BIDDING Bidding Documents are on file for reference at the following BID FORM: Bids shall be submitted in duplicate on forms issued by Architect. BID SECURITY: Bids shall be accompanied by a Bid Security of at least 10% of the total amount of the base bid and all additive alternate bids. This may be in the form of a certified check, cashier's check, bank draft or bid bond, payable to the Owner as a guarantee that should the bidder be awarded the Work, the bidder will enter into a contract with the Owner and will furnish the proper performance and payment bond within the time limit set by the Owner. Bid securities will be returned to all other bidders when the successful bidder files a proper performance and payment bond and the contract is executed by the Owner. If the successful bidder fails to file such contract and performance and payment bond, the amount of his bid security shall be forfeited to the Owner as liquidated damages. WAGE RULES: Each craft, type of worker and mechanic needed to execute the Contract shall be paid the prevailing wage rate for the locality in which the work is performed, in accordance with all federal laws and laws of the State as well as local ordinances and regulations applicable to the work hereunder and having force of law. PERFORMANCE BOND:A performance and payment bond for the full amount of the Contract will be required of the successful bidder. All costs associated with the bond shall be included in the bid amount. RIGHTS RESERVED The Owner reserves the right to waive any irregularities BY OWNER: and/or reject any or all bids when, in the opinion of the Owner, such action will serve the best interests of the Owner. WITHDRAWAL OF BIDS:No bid may be withdrawn for a period of 60 days after the opening of bids without written consent of the Owner.

Award

Educational

$785,000.00

Public - City

Renovation

7

9

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Maintenance of Membrane Roofing, Thermal Protection, Membrane Roofing, Joint Protection, Joint Sealants
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
153
Bidding Soon
2,356
All Active Projects
1,024
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

June 5, 2023

img_map_placeholder

Multiple Locations, Malta, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Roof Replacement Project at Malta Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.