Site work, paving and new construction of a mixed-use development in Renton, Washington. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; for paving for a municipal facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

The major components of the Contractor's work includes: demolition and removal of the current pad; yard piping the site for water, sewer, and electrical; grading and paving the site; procuring and installing a packaged aeration system, including all ductwork and foul air treatment; constructing the bunkers for compost operations; and permitting, procuring and installing a fabric canopy over part of the site. The project work is located at King County Wastewater Treatment Division (WTD) South Treatment Plant. The purpose of this project is to construct a pilot compost facility to evaluate an alternative process which will further process Class B Loop(R) biosolids into a Class A Loop compost. The work of this Contract includes: 1. Site demolition and clearing. 2. Construction of a bulk material bunker. 3. Construction of a biosolids bunker. 4. Construction of a mixed bunker. 5. Construction of a compost bunker. 6. Construction of a curing area. 7. Construction of a screening area. 8. Furnish and install precast concrete block wall as shown on the Drawings. 9. Installation of Owner furnished screening equipment. 10. Furnish and install mixer. 11. Packaged aeration system for the composting and curing areas. 12. Biofilter, foul air fans, ducting, and irrigation for pulling foul air from the composting and curing areas. 13. Design and installation of duct and duct support system. 14. Asphalt paving within the site. 15. Grading and site drainage trench and piping. 16. Relocation of electrical motor control center (MCC) and electrical cabinet. 17. Electrical power to the equipment. 18. Relocation of light poles. 19. Erosion and sediment controls. 20. Site water piping. 21. Installation of manual alarm station. 22. System testing and commissioning. 23. Final cleaning and site restoration. 24. Acquire permits for fabric canopy structures. 25. Furnish and install fabric canopy structures (one of which is a provisional item; noted as Bid Alternate). 26. And all other work as defined in the Contract Documents. Last Date for Questions : 3/2/23 05:00:00 PM Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Contract Specialist: Mark Hoge, mark.hoge@kingcounty.gov, 206-263-9325 Alternate Contract Specialist: Melissa Jordan, mejordan@kingcounty.gov, 206-263-4005 Apprenticeship Requirements: 15% minimum Apprentice Utilization Requirement of the total labor hours worked during the contract. SCS Utilization Requirements. 12% minimum requirement for King County Certified Small Contractors and Suppliers (SCS). MBE (21%), WBE (25%) Bid Guaranty: Not less than five percent (5%) of the Total Bid Price. Work site: South Treatment Plant, 1200 Monster Rd SW, Renton, WA 98057 Engineer's Estimate: $2,741,000 Achieve Substantial Completion within 180 days+ Achieve Final Acceptance within 60 calendar days after issuance of Substantial Completion

Bid Results

Municipal

$3,561,701.00

Public - County

New Construction, Paving, Site Work

47

36

46

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
30
Bidding Soon
880
All Active Projects
380
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

June 26, 2023

img_map_placeholder

1200 Monster Rd SW, Renton, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.