BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 1, 2024 at 7:00 PM

Updated February 2, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Frankfort, Kentucky. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways Bridge project in Franklin County on (037B00074N) KY-676 (East- West Connector) at Kentucky River & KY-1263 Item No. - 5-10045.00 Project Manager - Kameryn Underwood, P.E. User Division - Highway Design Approximate Fee - $265,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - Federal Bridge Program (FBP Funds) Project Length - Approximately 0.16 miles The purpose of this project is to replace the substandard structure (Bridge ID 037B00074N) on KY 676 (East-West Connector) at the crossing of the Kentucky River and KY 1263. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan should demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. An additional page will be allowed in the Project Approach (Section 7) to exhibit this plan. A maximum of four (4) points will be considered in the Evaluation Factors for the DBE Participation Plan. First Selection Meeting: March 13, 2023 Final Selection: March 28, 2023 Pre-Design Conference: April 5, 2023 Consultant Fee Proposal: April 14, 2023 Contract Negotiations: April 26, 2023 Notice to Proceed: May 17, 2023 The method of contractor selection has not been determined at this time.

Design

Bridges / Tunnels

$265,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
142
Bidding Soon
1,736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

Project location map

KY-676, Frankfort, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.