BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Pollock Pines, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

As of June 10, 2024, a design team has been identified. Closed solicitation has been included below for reference. ……………….. Any questions regarding information within this RFQ/RFP shall be submitted in writing via email to Project Manager Mr. Doug Venable at dvenable@eid.org. This Scope of Work describes the anticipated tasks necessary to complete an Environmental Impact Report (EIR) for the Districts Sly Park Intertie Replacement Project (Project). The proposed project involves the replacement of approximately 4.5 miles of existing 22 to 30-inch diameter steel pipeline with 12 to 30-inch diameter concrete mortar steel pipeline constructed with standard protective coatings and cathodic protection system. The new pipeline would be installed in the existing Sly Park Intertie pipeline alignment and the delivery system would be upgraded from a raw water to a treated potable water supply system. A new pump station would be constructed to allow for bidirectional flow between the Districts Reservoir 1 and Reservoir A drinking water treatment plants. A complete description of the proposed project and a listing of probable environmental effects of the proposed project are provided in the Notice of Preparation (NOP). The District reserves the right not to accept any exceptions to the specifications. The El Dorado Irrigation District reserves the right to waive informalities or technicalities in proposals. Proposal signer represents that he/she is duly authorized to execute and sign documents on behalf of his/her respective entity. Any questions regarding information within this RFQ/RFP shall be submitted in writing via email to Project Manager Mr. Doug Venable at dvenable@eid.org. To be considered, questions must be received by the District no later than 3:00 p.m. on Wednesday, March 1, 2023. Board consideration of Contract Award 03/27/2023 Notice to Proceed 03/31/2023 Kick-off Meeting 04/12/2023 Release Draft EIR for Public Review 09/27/2023 Draft EIR Public Meeting 10/11/2023 Final EIR for Certification by the Board 01/22/2024

Award

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
64
Bidding Soon
887
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

4771 Sly Park Rd, Pollock Pines, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.