Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and asbestos abatement for an educational facility in Taylor, Michigan. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.
Taylor School District will be receiving sealed bids for "Asbestos Abatement Prior to Demolition at Taylor Kennedy High School and Board of Education Building". These projects will be completed in April 2023, prior to scheduled demolition of each building and will include the removal of all identified asbestos materials in each building. All bids shall be accompanied by a sworn statement, in accordance with MCL 380.1267, disclosing any familial relationship that exists between the owner(s) or any employee of the bidder and any member of the Board of Education of the School District or the Superintendent of the School District. All bids shall be accompanied by a sworn statement, in accordance with MCL 129.313, certifying that the bidder is not an Iran linked business. The Board of Education shall not accept a bid that does not include sworn and notarized copies of the familial relationship disclosure statement and affidavit of compliance with the Iran Sanction Act. Taylor School District reserves the right to reject any or all bids either in whole or in part or to waive any informalities or irregularities that may be in the best interest of the School District. Questions Regarding Project Specifications: All questions regarding the Project Specifications should be addressed to: Roosevelt Austin III, Arch Environmental Group, Inc. Office: (248) 426-0165 Mobile: Roosevelt Austin III Email: rosey@archenvgroup.com The first and only project for abatement at John F. Kennedy High School includes the removal and disposal of all asbestos flooring materials, including all asbestos floor tile and non-asbestos carpet materials, all asbestos thermal system insulation materials, including all asbestos duct insulation, all asbestos tank insulation, all asbestos greenhouse planter panels, all asbestos lab countertops, all asbestos safe door gaskets, all tagged fire doors and tagged fire door frames from throughout the building. The project will include, but is not limited to, the entire interior of the building. These projects at John F. Kennedy High School will involve multiple negative pressure enclosures to remove the asbestos materials using Class I and Class II removal procedures. The project will begin on Monday, April 10, 2023, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Saturday, April 29, 2023. The project schedule allows for a total of eighteen (18) work days (Monday-Saturday, MondaySaturday, Monday-Saturday) to complete the project. Building(s): John F. Kennedy High School 13505 Kennedy Drive Taylor, Michigan 48180 Board of Education Building 23033 Northline Road Taylor, Michigan 48180
Bid Results
Educational
$86,000.00
Public - City
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 2, 2023
April 10, 2023
April 29, 2023
Multiple Locations, Taylor, MI
Related To This Project
Taylor, MI
Bid Date: Mar 15 2023
Taylor, MI
Bid Date: Mar 15 2023
Taylor, MI
Bid Date: Feb 27 2024
Taylor, MI
Bid Date: Aug 05 2020
Taylor, MI
Bid Date: Apr 24 2023
Taylor, MI
Bid Date: Apr 28 2023
Taylor, MI
Bid Date: Jun 05 2023
Taylor, MI
Bid Date: Feb 27 2023
Taylor, MI
Bid Date: Feb 27 2023
Taylor, MI
Bid Date: Feb 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--