BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of an educational facility in Hermann, Missouri. Completed plans call for the renovation of a educational facility.

For a HVAC Replacement project at the Gasconade County R-I School District, 176 Bearcat Crossing. The project consists of the replacement of 22 rooftop units at Hermann High School located at 176 Bearcat Crossing. All replacement units shall meet the minimum efficiency requirements shown in the unit specifications. The contractor shall provide all the necessary equipment, labor, materials, tools, supplies, components, and means of disposal to successfully complete the replacement of existing HVAC units within a fixed-price contract. The contractor is responsible for compliance with all building codes; work not in compliance with the codes shall be deemed unacceptable. Care must be taken to avoid damaging the roof where work is being performed. All existing equipment must be disposed of by the contractor in accordance with the law. All work is to be completed in accordance with State of Missouri prevailing wage laws. Procure and install new like-for-like Carrier high-efficiency RTUs. All equipment proposed must have a minimum 14 SEER rating. Also include an alternate proposal of 16 SEER or higher efficiency equipment. All equipment must accept 460 Volt- 3 phase power. New units must have hail guards installed Proposed/Installed unit weight shall not exceed 5% above existing RTU weight. Reuse existing through-roof curbs, or provide the necessary curb adapters. Install new B31R style gas regulators, gas shutoffs, gas line, conduits, wiring, and drain lines at unit location. Reuse existing through roof conduit, wiring, disconnects, and duct work. Equipment must have a Demand Controlled Ventilation air intake system installed with a unit mounted air quality controller. Equipment shall be quoted with stainless steel heat exchangers. Controls Integrate existing fire alarm systems into new equipment. Install new programmable thermostats and remote room air sensors with a minimum of 2 heat/2 cool stages in place of existing controls.

Award

Educational

$610,189.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
59
Bidding Soon
854
All Active Projects
328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

April 5, 2023

img_map_placeholder

176 Bearcat Crossing, Hermann, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.