BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2020 at 7:00 PM

Updated September 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Hermann, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Job J5S3176 Route J Gasconade County. Bridge replacement over First Creek 0.5 miles west of Rte. 100, the total length of improvement being 0.063 miles. Range: $500K to $750K Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid MODOT - D02 Route J - Bridge Replacement

Award

Bridges / Tunnels

$620,161.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
114
Bidding Soon
1,129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2020

November 16, 2020

Project location map

State Hwy J, Hermann, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.