Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Spearfish, South Dakota. Working plans call for the renovation of a educational facility.
As of April 11, 2023, project is on hold. No definite date for the rebid. The Spearfish School Board Reserves the Right to Reject Any and All Proposals, to Waive Any Informality in the Proposals Received and to Accept the Proposal That is to the Advantage of and in the Best Interest of the School District. The Project consists of the alteration of the high school and middle school boys and girls locker rooms and the demolition of the associated site elements indicated on the construction documents. The project is broken down into two separate scopes of work in two separate locations in the building. Bidders are being asked to bid each scope of work separately and combined. The lowest combination bidder for both projects or the lowest combination of two separate bidders will be selected depending on which scenario results in the lowest bid price. It is also possible that one project is accepted and the other isn't depending on the schools budget. Project construction may start in intervals as indicated in the bid documents and specifications with initial demolition in the high school locker rooms to begin as soon as March 27th. Bid award is expected on Monday, March 13, 2023 at the Spearfish School Board Meeting however all bids shall be held firm for thirty days after the bid opening. Project completion will be in phases as follows: o High School Boys Locker Room Substantial Completion: July 28, 2023 o Chemistry Renovation/Substantial Completion: August 11, 2023 o High School Girls Locker Room Substantial Completion: August 15, 2023 o Middle School Girls and Boys Locker Room Substantial Completion: August 18th, 2023 o Chemistry and Locker Room HVAC/Rooftop Equipment Substantial Completion: December 29, 2023 Project construction for the Chemistry Room involves a complete renovation of the existing chemistry classroom along with some minor renovation work in the two adjoining classrooms and storage/work rooms. The project also includes a new rooftop mechanical unit. Major project components include: Concrete cutting, cast in place concrete, demolition, cold-formed metal framing, rough carpentry, architectural wood casework, single ply roofing cut and patch, joint sealers, gypsum board assemblies, resilient flooring, interior painting, acoustical ceilings, marker boards, plumbing, gas piping, electrical, and HVAC. Project construction for the locker rooms involves a complete renovation of the existing high school locker rooms, coach's rooms and training room and a partial renovation of the existing middle school locker rooms and coaches' rooms. This project also includes new rooftop mounted mechanical equipment. Major project components include: Demolition, concrete cutting, cast in place concrete, unit masonry, cold-formed metal framing, metal fabrications, rough carpentry, architectural wood casework, fiberglass reinforced paneling, thermal insulation, thermoplastic membrane roofing, sheet metal flashing / trim, joint sealants, hollow metal frames, clad wood doors, access doors, gypsum board assemblies, tiling, acoustical ceilings, resilient flooring, tile carpeting, interior painting, visual display units, plastic toilet compartments, toilet / bath accessories, metal lockers, plumbing, HVAC and electrical.
Final Planning
Educational
$199,323.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2023
October 11, 2023
1725 N Main St, Spearfish, SD
Related To This Project
Spearfish, SD
Bid Date: Mar 08 2023
Spearfish, SD
Bid Date: Apr 18 2023
Spearfish, SD
Bid Date: Aug 21 2024
Spearfish, SD
Bid Date: Dec 13 2023
Spearfish, SD
Bid Date: Apr 25 2023
Spearfish, SD
--
Spearfish, SD
Bid Date: May 09 2023
Spearfish, SD
Bid Date: Jun 06 2023
Spearfish, SD
Bid Date: Mar 14 2023
Spearfish, SD
Bid Date: Jan 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.