EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Hummelstown, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For the repair or replacement of guide rail, median barrier, bridge railing, right-of-way fence, and appurtenances damaged by traffic and for new guide rail installation for safety updates on various state routes in ADAMS, CUMBERLAND, FRANKLIN, YORK, DAUPHIN, LANCASTER, LEBANON, and PERRY COUNTIES, COMMONWEALTH OF PENNSYLVANIA. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: GUIDE RAIL 408 Version: 2020-5 PennDOT - 2023-2024 Guiderail *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/Group ID:0000/GDR/---

Award

Roads / Highways

$7,441,603.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation Construction and Equipment, Roadway Construction, Impact Attenuating Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
115
Bidding Soon
1,729
All Active Projects
771
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, Hummelstown, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023-2024 Guiderail

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.