BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Northampton, Massachusetts. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Design extension of Rocky Hill Greenway shared use path to fill a gap between the current path at Florence Road and the next section of the path at Burts Pit Road, Northampton, approximately 1.1 miles. Design to full PS&E and right-of-way plans meeting all MassDOT design standards and requirements The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
234
Bidding Soon
4,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

Project location map

Multiple Locations, Northampton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.