EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Santa Clarita, California. Completed plans call for the renovation of a communication facility.

The projects and services depend on partial funding from the E-Rate program. The OWNER expects each Contractor to make themselves thoroughly familiar with any rules or regulations regarding the E-Rate program. All contracts entered into as a result of these Form 470's will be contingent upon specific funding by the SLD at the percentage rate submitted. The percentage rate applicable to a particular Form 471 is the maximum that the District is liable for. The Contractor will be responsible to bill the government (USAC) for the balance. No billing or work A Payment Bond and Performance Bond for contracts over $25,000.00 WILL BE required prior to the execution of the contract. The Payment and Performance Bond shall be in the form called for in the contract documents. Payment Bond and Performance Bond shall be provided upon receipt of the Notice to Proceed A BID BOND shall be required and shall be supplied with the CONTRACTOR'S bid on the day of the bid. All bids shall be presented under sealed cover and accompanied by one of the following forms of bidder's security: cash, a cashier's check, certified check, or a bidder's bond executed by an admitted surety insurer, made payable to the trustees Bid Bond shall be required for this project. If awarded the contract, will execute the Agreement within five (5) working days after award of the contract, and will furnish prior to the execution of the Agreement, on the prescribed forms, a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price and separate Payment (labor and material) Bond in an amount not less than One-Hundred percent (100%) of the total bid price in accordance with the Project documents and Civil Code Section 3248, and furnish certificates evidencing that the required insurance is in effect in the amounts set forth in the General Conditions. The Faithful Performance Bond shall remain in full force and effect through the guarantee period as specified in the General Conditions. In case of refusal or failure to timely execute the Agreement and furnish the required bonds and insurance certificates, the bid security shall be forfeited to the OWNER. If the Bidder elects to furnish a bid bond as its Bid Security, the Bidder shall use the bid bond form included herein. Question Deadline: March 3, 2023 @ 11:00am PST

Award

Communication

$1,594,417.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
114
Bidding Soon
2,091
All Active Projects
877
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

May 8, 2023

img_map_placeholder

22245 Placerita Canyon Rd, Santa Clarita, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.