BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in Fresno, California. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The scope of work includes sidewalk to fill in gaps along Blackstone Avenue between Hedges and Cambridge Avenues, transition pavement, a section of roadway reconstruction, median reconstruction, curb and gutter installation, and pedestrian lighting. Improvements also include storm drain installation, water service lateral installations, water main removal, and meter service reconnections, as well as roadway grinding, slurry, and new striping installation License Requirements Class A or Class C-34 and Class C-36. Water service transfers will be performed by a contractor with a "D-1" Water Distribution License or have a listed subcontractor with a valid "D-1" Bid Valid 64 days Liquidated Damages $500.00 per calendar day Project Duration 60 working days from notice to proceed date Online Q&A Yes Q&A Deadline 03/21/2023 5:00 PM (PST) The work hereunder constitutes a "public work" as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a "public work" in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of contracts for the City. A copy of the resolution is on file at the Office of the City Clerk. Actual wage schedules are available at Construction Management Office, 1721 Van Ness Avenue, Fresno, California 93721, (559) 621-5600. Contractors and Subcontractors must meet any and all requirements of Labor Code sections 1771.1 and 1771.5 prior to submitting bids The City reserves the right to reject any and all bids. Bidders are advised that as required by the Fresno Municipal Code, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%.

Award

Roads / Highways

$2,649,222.00

Public - City

Outdoor Lighting, Paving, Site Work

14

5

13

9

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
401
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

June 26, 2023

img_map_placeholder

Blackstone Ave, Fresno, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.