Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Fresno, California. Completed plans call for site work for a road / highway.

The scope of work includes, but is not limited to: removing existing pedestrian heads and upgrading to Countdown Pedestrian Heads and removing existing push buttons and upgrading to APS Push Buttons. This project includes various intersections along Blackstone and Ventura/Kings Canyon Road. PW FILE NO. 12703 FUND/ORG: 22048/189901 The Construction Allocation for this project is $2,060,500. Question Deadline 03/21/2023 at 5:00 PM PT Online Q&A Yes Questions will be accepted only up to 5 working days prior to the bid opening date The Specifications describing this project have been carefully prepared. Any questions or concerns relating to these Specifications shall be directed in writing to the designated Procurement Specialist of the Purchasing Division (see cover page) and shall be sent by facsimile to the RIGHTFAX number on the cover page Any questions concerning Disadvantaged Business Enterprise (DBE) issues shall be ad A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work the form of a certified or cashier's check The DBE Goal for This Project is Seventeen Percent (17%). DBE Participation Shall Be Calculated on the Basis of the Total Net Bid Amount And on All Possible Combinations of the Base Bid Plus Add Alternate(S), if Applicable Liquidated Damages $500 Per Calendar Day Project Duration 90 Calendar Days from Notice to Proceed The Construction Allocation for this project is $2,060,500. No bid will be considered for award unless the Bidder at the time of bid opening, is licensed with a valid Class "A" or Class "C-10" Contractor's License issued by the State of California

Award

Roads / Highways

$1,469,097.00

Public - City

Site Work

8

8

9

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
56
Bidding Soon
923
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

May 29, 2023

Project location map

Multiple Locations, Fresno, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed