BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Santa Cruz, California. Conceptual plans call for site work for a water / sewer project.

The City of Santa Cruz Water Department (City) intends to convert its existing production wells Beltz 8 and Beltz 12 to aquifer storage and recovery (ASR) wells. Pilot testing was conducted at Beltz 12 in 2019 and at Beltz 8 in 2020-2021; further study of the operational characteristics of the wells as ASR facilities began in January 2022 and is anticipated to continue through Summer 2023. Ancillary studies are underway or planned to evaluate the suitability of other City-owned production wells for conversion to ASR wells. The City is seeking proposals from qualified engineering firms interested in providing design engineering and bidding assistance services required for this project. Services include developing construction plans, specifications, and bid documents for demolishing and/or retrofitting the existing well pumps, discharge and facility piping, mechanical and electrical components and equipment, controls and SCADA integration, and associated appurtenances of the permanent ASR well facilities per City of Santa Cruz guidelines. Engineering analysis will include determination of recharge flow-control mechanism, ASR well hydraulics, and best practices for converting an existing production well to and ASR well. The design of Beltz 8 and 12 facilities should take into consideration future growth of the City’s ASR program and additional ASR wells being brought online. Deadline for submitting additional questions Monday, 3/13/2023 Questions or concerns prior to the intent to award notice will be directed to: Jillian Brown, Water Resources Engineer (HDR) phone: 916-679-8722 or email: jibrown@santacruzca.gov Notice of intent to award Week of 4/17- 4/21/2023 The method of Contractor Selection has not been Determined at this time. The contract resulting from this solicitation is tentatively scheduled to begin June 2023. As of March 1, 2023, the due date and time has been confirmed with the owner.

Conceptual

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2024

img_map_placeholder

Multiple Locations, Santa Cruz, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.