Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of renovating Classroom 2510 on the 2nd floor of the Grainger Hall Building. The project includes demolishing existing raise floor platforms, installing new partitions (gwb on steel stud framing), installing acoustical lay-in ceilings, installing a raise floor system, updating finishes, equipment, electrical systems, and fire protection to the area of work.

Bid Results

Educational

$320,129.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
110
Bidding Soon
2,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

May 11, 2023

Project location map

975 University Ave, Madison, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed