Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a parking garage in Winnipeg, Manitoba. Completed plans call for the renovation of a parking garage.
The Work to be done under the Contract shall consist of the replacement of one boiler at the City of Winnipeg Brandon Garage. The major components of the Work are as follows: (a) Remove existing boiler, B-1 and circulation pump, BIP-1 and associated gas piping, hydronic piping and venting. (b) Install new boiler, B-1 and circulation pump, BIP-1 and associated gas piping, hydronic piping and venting. (c) Connect new equipment to existing DDC system. (d) Remove electrical provisions for removed mechanical equipment. (e) Provide new electrical provisions for new mechanical equipment. The Bidder shall not be entitled to rely on any information or interpretation received at the Site investigation unless that information or interpretation is the Bidder's direct observation, or is provided by the Contract Administrator in writing. The Bidder is responsible for inspecting the Site, the nature of the Work to be done and all conditions that might affect their Bid or their performance of the Work, and shall assume all risk for conditions existing or arising in the course of the Work which have been or could have been determined through such inspection. Bid submissions must be done through the Merx platform.Official bid documents must be obtained from www.merx.com
Award
Parking Garage
$151,625.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 24, 2023
April 24, 2023
November 17, 2023
421 Osborne St, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Mar 23 2023
Winnipeg, MB
Bid Date: Mar 20 2023
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Mar 13 2023
Winnipeg, MB
Bid Date: Mar 24 2023
Winnipeg, MB
Bid Date: Mar 29 2023
Winnipeg, MB
Bid Date: Mar 23 2023
Winnipeg, MB
Bid Date: Mar 02 2023
Winnipeg, MB
Bid Date: Mar 28 2023
Winnipeg, MB
Bid Date: Apr 28 2023
Winnipeg, MB
Bid Date: Mar 23 2023
Winnipeg, MB
Bid Date: Dec 31 2031
Winnipeg, MB
Bid Date: Mar 27 2023
Winnipeg, MB
Bid Date: Mar 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--