Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in New York, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.
CR Number: 2095690 This Design-Build project will reconfigure the merge between the two southbound lanes of the FDR Drive and the two entrance lanes from the Harlem River Lift Span of the RFK Bridge. Currently these four lanes transition to three lanes through a short, non-standard center-lane merge. This project will carry the four southbound lanes to the 116th Street exit, eliminating the center lane merge and maximizing the weaving distance. RK-90 will add an auxiliary lane to the southbound FDR from the RFK-FDR Ramp merge with the FDR Drive and terminate at the 116th St. Exit Ramp. This lane addition will provide safety improvements and Level of Service upgrades along the FDR Drive, just downstream of the RFK. The RK-90 project serves as an enabling project that will eliminate the current substandard merge where the RFK-FDR Ramp joins the SB FDR Drive and allow future replacement of the original RFK structures. In addition, this project will reduce congestion which backs up the FDR ramp, extends across the HRLS and through the Manhattan Plaza junction. The current congestion not only affects B&T customer safety and travel times, it also hinders construction staging for the future reconstruction of both the RFK-FDR Ramp and Manhattan Plaza. The addition of a fourth southbound auxiliary lane, and associated widening of the southbound FDR Drive, necessitates the replacement of the existing East 120th St. Pedestrian Bridge overpass and access ramps, which currently do not meet ADA criteria. The proposed replacement Pedestrian Bridge will meet ADA and new AASHTO criteria for shared use, and ultimately provide another key entry to the future East River Greenway. The intersection of Paladino Avenue and East 120th Street will be reconstructed in the vicinity of the new pedestrian bridge to establish a connection from the sidewalks along East 120th Street and Paladino Ave to the new pedestrian overpass. The project will include widening and resurfacing of the FDR within the projects limits and all associated lighting, signage, pavement markings and utility relocations such as drainage, water and electric facilities. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 18 Months
Post-Bid
Roads / Highways
$300,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2023
December 13, 2023
Multiple Locations, New York, NY
Related To This Project
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Mar 31 2023
New York, NY
Bid Date: Apr 06 2023
New York, NY
Bid Date: Mar 27 2023
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Mar 22 2023
New York, NY
Bid Date: Apr 04 2023
New York, NY
Bid Date: Aug 08 2023
New York, NY
Bid Date: Apr 18 2023
New York, NY
Bid Date: Mar 29 2023
New York, NY
Bid Date: Apr 05 2023
New York, NY
Bid Date: Mar 09 2023
New York, NY
Bid Date: Mar 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.