BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Suisun City, California. Completed plans call for site work for a sidewalk / parking lot.

As of May 1, 2023, the project has been awarded. A timeline for construction has not been confirmed. Solano Transportation Authority Contract No. 2023-02 The Solano Transportation Authority (Authority) intends to construct parking lot improvements fronting Suisun Street near Common St in Suisun City. Proposed improvements include but not limited to curb and gutter, vertical curb, bioretention curbs, sidewalk, driveway, asphalt pavement plugs, asphalt digouts, storm drainage pipe, curb inlets, dome inlets, subdrain pipe, drainage swale, bioretention area, adjusting inlets, coordination with utility companies for box adjustments, asphalt paving and class 2 aggregate base in parking lot, pavement markings, lighting, security system, landscaping, planting, irrigation, underground electrical, foundations for electrical equipment, removal of existing fences and installation of new ornamental fence and sliding gate and pedestrian gate with knock box for access, key pad access, access cards, detector loops, installation of new EV charging stations and all other associated electrical work. Additional work includes miscellaneous sidewalk demo and replacement work to install new ornamental fences and gates at the back of new STA building. The Contractor must have a Class A General Engineering Contractors license. The successful bidder shall complete work within 260 working days from the commencement date set forth in the Authoritys notice-to-proceed. If the successful bidder fails to complete the work within the above-specified time limit, the Contractor shall pay liquidated damages to the Authority, computed at the rate outlined in the 2018 Caltrans Standard Specifications. The estimated cost of construction is $2,050,650. The DVBE Contract goal is 3 percent. You must meet the goal, under section 2-1.15. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Sidewalks / Parking Lot

$2,504,675.00

Public - County

Site Work

34

7

42

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
50
Bidding Soon
1,838
All Active Projects
788
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

May 8, 2023

img_map_placeholder

To Be Determined, Suisun City, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.