BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2023 at 8:00 PM

Updated October 9, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Palmer, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work consists of removing and demolishing the existing bridge and modifying the existing abutments to accept a modular truss bridge and installing new guardrails, railings, and roadway improvements adjacent to the bridge. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. All Bids for this project are subject to the provisions of Massachusetts General Laws Chapter 30, Section 39M as amended. A bid deposit shall be furnished in accordance with the Instructions to Bidders. This Contract contains allowances for price adjustments for diesel fuel, gasoline, and steel. Minimum Wage Rates as determined by the Commissioner of Department of Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the Contractor, before Bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed Work under this Contract.

Award

Bridges / Tunnels

$2,292,860.00

Public - City

Demolition, New Construction, Paving, Site Work

21

9

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
717
Active Projects
301
Bidding Soon
5,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 2, 2023

Project location map

Church St, Palmer, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.