BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Keystone, Colorado. Contact the soliciting agency for additional information.

(1) Platte River seeks bid proposals from manufacturers to manufacture, deliver, and field assemble a control enclosure for the new 230kV Severance Substation. This includes a modular enclosure, station service panels, cable trays, control and relay panels, and auxiliary enclosure equipment. (2) Platte River seeks bid proposals from manufacturers to manufacture and deliver standalone control and relay panels for use within an existing control enclosure at the Timberline Substation. Project questions submission deadline: Thursday, April 20, 2023, by 3:00 P.M. Prequalification due date and time: Wednesday, March 22, 2023, by 11:00 A.M. Platte River will only consider proposals from vendors that submit a completed financial prequalification form and safety prequalification form. Bid proposals may not be altered, withdrawn, or resubmitted for 90 days after the bid submission deadline. Platte River will return the bid deposit of the bidder awarded the contract when the awarded bidder signs the conformed contract and files a satisfactory performance bond, all required certificates of insurance, and a Colorado Certificate of Good Standing or its equivalent with Platte River. Platte River may retain the bid deposit of the second-ranked bidder until the final contract terms between Platte River and the successful bidder are fully signed. Platte River will return the bid deposit of all other unsuccessful bidders after the contract is awarded or when their bid proposals are rejected. The awarded bidder will be subject to the same equal employment opportunity regulations as Platte River. Platte River has sole discretion to accept one or more bid proposals that represent the best overall value to Platte River, taking into consideration the price and other evaluation factors set forth in the bid specification, and to reject any or all bid proposals, or to accept or reject any portion of any bid proposals. Platte River will not consider bid proposals received after the bid proposal submission deadline. For more information, please contact Contract Administration at website.

Post-Bid

Power Plant

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
39
Bidding Soon
1,008
All Active Projects
425
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

June 5, 2023

img_map_placeholder

To Be Determined, Keystone, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.