Renovation of an educational facility in Hamilton, Ohio. Completed plans call for the renovation of a educational facility.

1. All required permits are to be obtained by the roofing contractor. 2. Provide all labor, equipment, and materials to install the roof system over the properly prepared substrate. 3. All lightning protection to be reinstalled on new alum. Adhesive pads set in white urethane adhesive to match existing. 4. All TPO accessories required for warranty. 5. Install rigid EPS flute fill to fit existing standing seam profile. 6. Overlay flute fill with 4'x8'x1.5" polyiso. Keep all joints tight. 7. Mechanically fasten 1:2 SF - 16 fasteners per 4'x8' board. With OMG #14 screws and plates. Pull tests were performed by OMG. 1:2 SF fasting rate is required. 8. Install a fully adhered .045 white TPO membrane roof system. Follow all standard TPO details for a 15 year Garland warranty. 9. Fill the existing box gutter in section #1 with polyiso and spray expanding foam. Add 20 Ga closure angle to support new 1.5" polyiso. Mechanically fasten to wall and standing seam roof max. 12" o.c. 10. Install a polyiso saddle at the existing box gutter. The saddle slope is to be 2x's the field slope. Extend 16 feet at the widest point. 1.5" x 24" tapered woof fiber at roof curbs. Double layer Q's at large box gutter cricket to yield 1": FT back slope. Offset layers by 12" 11. Remove existing gutter. Install new 22 Ga prefinished straight back gutters per field sketch. Fasten to continuous 2x6 and not the flute blocking with 1/4 " S.S. lag screws max. 12" o.c. (gutter bar screws). Gutter to match existing girth. Submit shop sketches for approval before fabrication. Install new gutter head at existing gutter. 12. Install new 22 Ga Garland prefinished 4x5 downspouts 2 each for section #1. Anchor downspouts to the existing metal siding every 5 feet. Install new PVC 13. All contractor fabricated metal from Garland flat stock- Standard colors. 14. Install polyiso. crickets at all roof curbs. Slope to be twice the field slope. 15. At parapet walls, run the new TPO membrane up 12", install termination bar and 22 Ga prefinished Garland counter flashing. 16. Follow all standard Viking TPO Membrane details.

Award

Educational

$258,706.00

Public - County

Renovation

4

5

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
68
Bidding Soon
921
All Active Projects
403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2023

May 1, 2023

img_map_placeholder

To Be Determined, Hamilton, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.