Site work for a water / sewer project in Haverford Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

The project involves the replacement of approximately 350-linear feet of 8-inch sanitary sewer, replacement of laterals and associated restoration. The project is located on Brookline Boulevard between Beverly Road and Darby Road in Havertown PA. Clarification Deadline: 3/24/2023 5:00 PM Commencement - No later than May1st , 2023 Final completion- No later than June 15th , 2023 Phase 1 - South side of Brookline Blvd 1. During this Phase, traffic control should be established in accordance with the Phase 1 traffic control pattern indicated on Drawing CM7001. 2. All work shall be confined to the south side of the street from the doubleyellow line to the south curb line. 3. The following work shall be completed: a. Saw cutting of the road for both the sewer main replacement, the lateral replacement of those properties on the south side of the street, and portions of the lateral replacement for properties on the north side of the road from the main to within 1-foot of the double yellow line. b. Replacement of the existing sewer main. c. Replacement of the existing laterals on the south side from the new sewer main to the south face of curb or alternate location designated by the Township. d. Replacement of the existing laterals on the north side from the new sewer main to a point within 2-foot south of the double yellow line. e. Temporary paving restoration of all trenches. f. Connections of the new main to the existing manholes. Phase 2 - North side of Brookline Blvd 1. During this Phase, traffic control should be established in accordance with the Phase 2 traffic control pattern indicated on Drawing CM7001. 2. All work shall be confined to the north side of the street from the doubleyellow line to the north curb line. 3. The following work shall be completed: g. Saw cutting of the road for the lateral replacement of those properties on the north side of the road from the double yellow line to the north face of curb. h. Replacement of the existing laterals on the north side from the existing stub installed under Phase 1 to the north face of curb. i. Temporary paving restoration of all trenches. Phase 3 - Restoration 1. This work shall include final paving restoration in accordance with the detail. The work shall include the required cutback of the paving on all sides, excavation, and the installation of the required paving section. 2. The work shall be completed in two separate phases similar to the above work. Traffic control should be established in accordance with Phase 1 and Phase 2 traffic control patterns outlined for the above work.

Bid Results

Water / Sewer

$331,785.00

Public - City

Site Work

7

11

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
193
Bidding Soon
3,340
All Active Projects
1,596
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

May 1, 2023

img_map_placeholder

Brookline Blvd, Haverford Township, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.