Site work for a water / sewer project in Haverford Township, Pennsylvania. Completed plans call for site work for a water / sewer project.
The project involves the replacement of approximately 350-linear feet of 8-inch sanitary sewer, replacement of laterals and associated restoration. The project is located on Brookline Boulevard between Beverly Road and Darby Road in Havertown PA. Clarification Deadline: 3/24/2023 5:00 PM Commencement - No later than May1st , 2023 Final completion- No later than June 15th , 2023 Phase 1 - South side of Brookline Blvd 1. During this Phase, traffic control should be established in accordance with the Phase 1 traffic control pattern indicated on Drawing CM7001. 2. All work shall be confined to the south side of the street from the doubleyellow line to the south curb line. 3. The following work shall be completed: a. Saw cutting of the road for both the sewer main replacement, the lateral replacement of those properties on the south side of the street, and portions of the lateral replacement for properties on the north side of the road from the main to within 1-foot of the double yellow line. b. Replacement of the existing sewer main. c. Replacement of the existing laterals on the south side from the new sewer main to the south face of curb or alternate location designated by the Township. d. Replacement of the existing laterals on the north side from the new sewer main to a point within 2-foot south of the double yellow line. e. Temporary paving restoration of all trenches. f. Connections of the new main to the existing manholes. Phase 2 - North side of Brookline Blvd 1. During this Phase, traffic control should be established in accordance with the Phase 2 traffic control pattern indicated on Drawing CM7001. 2. All work shall be confined to the north side of the street from the doubleyellow line to the north curb line. 3. The following work shall be completed: g. Saw cutting of the road for the lateral replacement of those properties on the north side of the road from the double yellow line to the north face of curb. h. Replacement of the existing laterals on the north side from the existing stub installed under Phase 1 to the north face of curb. i. Temporary paving restoration of all trenches. Phase 3 - Restoration 1. This work shall include final paving restoration in accordance with the detail. The work shall include the required cutback of the paving on all sides, excavation, and the installation of the required paving section. 2. The work shall be completed in two separate phases similar to the above work. Traffic control should be established in accordance with Phase 1 and Phase 2 traffic control patterns outlined for the above work.
Bid Results
Water / Sewer
$331,785.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2023
May 1, 2023
Brookline Blvd, Haverford Township, PA
Related To This Project
Haverford Township, PA
Bid Date: Jun 26 2023
Haverford Township, PA
Bid Date: Dec 06 2021
Haverford Township, PA
--
Haverford Township, PA
Bid Date: Jun 05 2024
Coplay, PA
Bid Date: May 29 2023
Colebrookdale Township, PA
Bid Date: Apr 05 2023
East Lansdowne, PA
Bid Date: Mar 30 2023
Orrtanna, PA
Bid Date: Apr 06 2023
Bernville, PA
Bid Date: Apr 11 2023
Pittsburgh, PA
Bid Date: Mar 29 2023
Lower Saucon Township, PA
Bid Date: Aug 14 2023
Harrisburg, PA
Bid Date: Mar 29 2023
Biglerville, PA
Bid Date: Apr 06 2023
Folsom, PA
Bid Date: Mar 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.