BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Garfield, Arkansas. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Pre-bid questions shall be submitted NO LATER THAN 5 days after date of the site visit. Submit questions only through email to the following: Contracting Officer, Jason Burdett, Jason_burdett@nps.gov Project Title: Rehab Elkhorn West Overlook at Pea Ridge National Military Park, Garfield AR. This solicitation is set-aside for Total Small Business Concerns. NAICS Code 238990, size standard - $19.0M. The construction magnitude is between $250,000.00 and $500,000.00. A site visit will be held on 18 April 2023 at 10:00AM CDT. See clause 52.236-27 Site Visit (Construction) for details and instructions. Bids are to be submitted via email only. Please refer to Provision entitled "Instructions to Bidders and Other Information - Sealed Bid" for detailed instructions. Bonds required as stated in Block 12. A 20% bid guarantee is required (refer to submission requirements, pg. 39 of the solicitation.) Performance and payment bonds required. Performance and Payment bond protection in the amount of 100% of final contract award amount required. Please ensure Company UEI number is annotated in Block 14. Please ensure one lump sum is provided in Block 17. Please ensure all information required in Section L of this solicitation is provided with Bid. CALL-IN INFORMATION: Bid Openings will be performed via conference call. Interested parties may attend the bid openings by using the call-in information below: Bid Opening Date/Time: Wednesday, 3 May 2023 @ 10:00am CDT Conference Line: 866-782-6198 Passcode: 9091532 Any changes to the call-in information will be provided in a future Amendment for any interested party. Delivery: 75 Days After Notice to Proceed Delivery Location Code: 0009060428 NPS, Pea Ridge NMP 15930 E. Hwy 62 Garfield AR 72732-9532 US Repair and Rehabilitate Elkhorn West Overlook The Work includes Repair and reconstruction of the west overlook at Pea Ridge National Military Park. The scope includes removal and replacement of parking lot pavement, curb and gutter, sidewalk, storm sewer, and repair of the natural stone retaining wall. Wall improvements include re-pointing the entire wall and removal and replacement of a section of wall that is failing. Period of performance for completion of improvements is 75 working days (including 11 weather days). 00010 Repair and Rehab EH West Overlook Product/Service Code: Z2LZ Product/Service Description: REPAIR OR ALTERATION OF PARKING FACILITIES Period of Performance: 05/25/2023 to 08/08/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work phases. 3. Work under other contracts. 4. Government Furnished Materials. 5. Contractor use of premises. 6. Public use of site. 7. Work Restrictions. 8. Special Construction Requirements. 9. Soils Investigation Report. 10. Additional Reports. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Location: Pea Ridge National Military Park, Garfield, Arkansas. The overlook is located off of Military Park Road on the north side of the Park. B. The Work consists of the following: 1. The Work includes Repair and reconstruction of the west overlook at Pea Ridge National Military Park. The scope includes removal and replacement of parking lot pavement, curb and gutter, sidewalk, storm sewer, and repair of the natural stone retaining wall. Wall improvements include re-pointing the entire wall and removal and replacement of a section of wall that is failing C. Project will be constructed under a single prime contract. Period of performance for completion of improvements is 75 working days (including 11 weather days). Work consists of the following: A. Stone masonry reconstruction and stabilization involving partial mortar repointing and mortar wash repairs to the stone walls of the West Overlook and planter beds. Built circa 1964, this historical stone and mortar retaining wall is approximately 300 feet long varying in height from +-2 feet minimum to +-8 feet maximum. The stone wall was constructed to resemble an Ashlar style stone pattern with random size stone units and inset mortar joints to give the appearance of a dry-laid wall. The following outlines the various work items to be completed for the wall and planters: a. Remove and reconstruct existing wall (including footing) from Sta. 2+32.66 to Sta. 2+62.66 (30 ft.) b. Raise the existing wall height by furnishing additional stone and mortar from Sta. 1+35 to 2+85 (150 ft.) c. Repoint approximately 75% of exposed wall surfaces (front face and back face) from Station 1+35 to 2+85 (150 ft.) The wall height through this section varies from 4'-0" minimum to 8'-1" maximum. d. Repoint exposed surfaces of planter boxes (2 total) e. Replace missing stones throughout the existing wall that have become dislodged (Minimum of 9 locations along the front face and top face of wall) Contracting Officer administrating the Contract: Jason Burdett Contracting Officer National Park Service 601 Riverfront Drive Omaha NE 68102 Telephone No. (501) 762-9517 Email: jason_burdett@nps.gov

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - Federal

Paving, Site Work

3

15

18

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
73
Bidding Soon
922
All Active Projects
415
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2023

June 1, 2023

August 15, 2023

img_map_placeholder

15930 US-62, Garfield, AR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.