BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Burlington, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Region: 4 Counties: Kit Carson Contract UDBE Goal: 6.00% Workdays: 285 It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 (X) Greater than $20,000,000 This Project Consists of Work on I-70 Between Bethune and the Kansas Line. I-70 Bethune (Mp 427.4 to Mp 436.3) Will Consist of Constructing Two (2) Detour Crossings, Resurfacing the Eb and Wb Lanes With 6 Inch Hma Mill and Fill. Minor Shoulder Reconditioning Will Be Required Within Areas of the 6 Inch Mill. Structures G27-r (Eb) & G-27-i (Wb) at Approximate Mp 427.5 Will Include Structure Rehabilitation, Resurfacing, Minor Substructure Repair, and Abutment Drainage Installation. Other Work Includes Upgrading Emergency Median Crossovers, Traffic Signage, Delineators, Striping, and Guardrail. I-70 Burlington to Kansas Line (Mp 438.7 to Mp 449.6) Will Include Resurfacing the Wb Lanes With Two (2) 1.5 Inch Lifts of Hma, Repair of 16 Compression Joints, Upgrading Guardrail, Delineators and Striping. Please contact Rhianna Poss at 719-775-8003 for all project questions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. CODOT - 001 - Resurfacing the Westbound Lanes of I-70 With a Hot Mix Asphalt Overlay, and Other Improvements Questions and answers shall be used for reference only and shall not be considered part of the Contract The Department has determined that On the Job Training shall be provided to trainees with the goal of developing full journey workers in the types of trade or classification involved. The contract goal for On the Job Trainees working in an approved training plan in this Contract has been established as follows: Minimum number of total On the Job Training required 2,560 hours.

Award

Roads / Highways

$36,536,569.00

Public - State/Provincial

Paving, Site Work

196

11

9

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
11
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

January 1, 2024

img_map_placeholder

I-70, Burlington, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.