Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2024 at 7:00 PM
Updated February 4, 2024
Site work and paving for a civil project in Burlington, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
Region: 4 Counties: Kit Carson Contract UDBE Goal: 6.00% Workdays: 285 It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 (X) Greater than $20,000,000 This Project Consists of Work on I-70 Between Bethune and the Kansas Line. I-70 Bethune (Mp 427.4 to Mp 436.3) Will Consist of Constructing Two (2) Detour Crossings, Resurfacing the Eb and Wb Lanes With 6 Inch Hma Mill and Fill. Minor Shoulder Reconditioning Will Be Required Within Areas of the 6 Inch Mill. Structures G27-r (Eb) & G-27-i (Wb) at Approximate Mp 427.5 Will Include Structure Rehabilitation, Resurfacing, Minor Substructure Repair, and Abutment Drainage Installation. Other Work Includes Upgrading Emergency Median Crossovers, Traffic Signage, Delineators, Striping, and Guardrail. I-70 Burlington to Kansas Line (Mp 438.7 to Mp 449.6) Will Include Resurfacing the Wb Lanes With Two (2) 1.5 Inch Lifts of Hma, Repair of 16 Compression Joints, Upgrading Guardrail, Delineators and Striping. Please contact Rhianna Poss at 719-775-8003 for all project questions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. CODOT - 001 - Resurfacing the Westbound Lanes of I-70 With a Hot Mix Asphalt Overlay, and Other Improvements Questions and answers shall be used for reference only and shall not be considered part of the Contract The Department has determined that On the Job Training shall be provided to trainees with the goal of developing full journey workers in the types of trade or classification involved. The contract goal for On the Job Trainees working in an approved training plan in this Contract has been established as follows: Minimum number of total On the Job Training required 2,560 hours.
Award
Roads / Highways
$36,536,569.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
