Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Oregon City, Oregon. Completed plans call for site work for a water / sewer project.
As of March 16, 2023, a design team has been identified and construction began on Phase 3 in September 2022 and will be completed May 2023. Phase 1/2 were completed in November 2022. With the completion of all sewer moratorium projects in September 2019, and with no current moratorium in place, the next known deficiency to address in the sanitary sewer collection system is Infiltration and Inflow. For that reason, the Public Works Department will be pursuing the Infiltration and Inflow (I & I) Abatement Program in the upcoming biennium. 3-phase project, condensed to 2 phases (Phases 1 & 2 were consolidated due to lack of bidders for Phase 2) • Engineering Scope: Evaluate approximately 14,000 LF of sewer mainline for defects and recommend rehabilitation. Based upon evaluation, design project(s) and provide inspection services. • Phase 1 Scope: Rehab 6,400 LF of 6-to-10-inch concrete sewer via CIPP Lining. Replace 34 laterals and reinstate 100 laterals internally (including the replaced laterals). Minor amount of trench patching (associated with the lateral replacement). • Phase 2 Scope: Replace existing sewer main via HDD installation of 8-inch HDPE pipe along new alignment. Replace 10 laterals. Minor trench patching (associated with boring pits). • Phase 3 Scope: Replace 4,900 LF of 8-to-10-inch concrete sewer via pipe bursting and 3,100 LF of 6-to-10-inch concrete sewer via open trenching. Replace 90 laterals. Significant trench patching. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Under Construction
Water / Sewer
$4,510,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2022
Multiple Locations, Oregon City, OR
Related To This Project
Oregon City, OR
--
Oregon City, OR
Bid Date: Apr 27 2023
Oregon City, OR
Bid Date: Apr 06 2023
Oregon City, OR
Bid Date: Apr 27 2023
Oregon City, OR
--
Oregon City, OR
Bid Date: May 02 2023
Oregon City, OR
Bid Date: Apr 24 2023
Oregon City, OR
--
Oregon City, OR
Bid Date: Apr 11 2023
Oregon City, OR
--
Oregon City, OR
Bid Date: Jun 20 2023
Oregon City, OR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.