Published April 27, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Boalsburg, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The project includes slip lining an existing bridge structure, placement of non-shrink grout, construction of reinforced concrete footing extensions, placement of epoxy coated rebar, and rock armoring. Bids must be upon the forms provided by Harris Township and enclosed in a sealed envelope clearly marked "Mary Elizabeth Street Bridge Rehabilitation". Each proposal must be accompanied by a Certified Check or Bid Bond in the amount of Ten Percent (10%) of the bid amount made payable to Harris Township. The cost estimate of this transportation project is over $100,000 and is therefore subject to the Pa. Prevailing Minimum Wage Act. The Harris Township Board of Supervisors reserves the right to reject any or all bids.

Award

Bridges / Tunnels

$299,000.00

Public - City

Site Work

13

15

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
36
Bidding Soon
610
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

May 3, 2023

img_map_placeholder

Mary Elizabeth St, Boalsburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mary Elizabeth Street Culvert Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.