Site work and new construction of a water / sewer project in Bartlett, Illinois. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

The work consists of the construction of Devon Excess Flow Lift Station and associated appurtenances and site work. A. The work consists of the construction of the Devon Excess Flow Lift Station and associated appurtenances including underground piping work to the limits shown on the Plans. The new Lift Station shall replace an existing Excess Flow Treatment Facility and shall service an existing residential subdivision and shall receive and convey excess flows from the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) Lift Station located at the intersection of Devon and Berteau Avenues in the Village of Bartlett. The new Lift Station will include two influent sewers and two discharge force mains. B. There is a separate contract for the completion of Excess Flow Interceptor and Force Main Improvements associated with the new Devon Excess Flow Lift Station. The Lift Station contractor under this contract shall be responsible for construction of a portion of the influent sewers and discharge force mains to the limits shown on the Plans, while the Interceptor and Force Main contractor shall be responsible for completing the remainder of the associated underground piping work, including a majority of the new excess flow force main construction, under separate contract. Construction of the Devon Excess Flow Lift Station and of the Interceptor and Force Main improvements shall be completed concurrently, and coordination between the contractors and trades shall be required during critical phases of the work. C. Demolition of the existing Devon Excess Flow Treatment Facility, including demolition of the Devon DuPage Lift Station, shall also be completed under this contract. Demolition of the existing facilities shall not commence until after the Devon Excess Flow Lift Station and the Interceptor and Force Main Improvements are constructed and upon successful startup and testing of the new Lift Station and all equipment. Question Deadline 04/12/2023 at 5:00 PM CT Information / Clarification shall be submitted in writing by Email. Completion- 730 consecutive calendar days thereafter

Bid Results

Water / Sewer

$4,847,708.00

Public - City

New Construction, Site Work

31

20

42

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
95
Bidding Soon
1,934
All Active Projects
832
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

May 19, 2023

img_map_placeholder

To Be Determined, Bartlett, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.