BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a stadium in Durham, North Carolina. Conceptual plans call for site work for a stadium.

One-Two Sentences The artificial turf field in the O'Kelly-Riddick Stadium has reach the end of its useful life due to UV damage and the improper drainage as originally installed in 2008. Most artificial turf fields are expected to have a useful life of about 8 years. This project is for the advanced planning stage for a complete replacement of the 83,000 square foot artificial turf field and connection of drains to the existing campus storm water drainage system.

Conceptual

Arenas / Stadiums

$1,825,588.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
144
Bidding Soon
1,709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

June 2, 2023

Project location map

1801 Fayetteville St, Durham, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.