BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Weimar, Texas. Completed plans call for site work for a water / sewer project.

JTM Construction was awarded this project. Bids are invited for the Water Line Improvements: N. Summit St. and W. Converse St. project as described in the plans and specifications, including installation of approximately 1,900 linear feet (LF) of 8-inch waterline, service reconnections, fire hydrants, water valves and associated items A certified check or bank draft payable to the City of Weimar may be submitted in lieu of the Bid Bond. The successful bidder may not discriminate against its employees or applicants for employment on the basis of race, color, religion, sex, age or national origin. The City of Weimar reserves the right to reject any or all bids or to waive any minor informalities in the bid documents. The Contract will be awarded to the lowest responsible bidder. Mike BarrowfCity Manager City of Weimar Bids may be held by the City of Weimar for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. All qualified applicants shall receive consideration for employment without regard to race, color, religion, sex, or national origin. Bidders will be required to comply with the President's Executive Order No. 11246, as amended by Exe The surety company must have a minimum Best Key Rating of "B", or the surety company must be eligible to participate in the surety bond guarantee ' program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the related rules and regulations of the Treasury Department. The surety company and the agency or agent issuing the Payment and Performance Bonds must be authorized to issue and sign Payment and Performance Bonds in Texas in an amount equal to or greater than the total Contract price.

Award

Water / Sewer

$269,023.00

Public - City

Site Work

8

5

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
50
Bidding Soon
2,485
All Active Projects
946
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Weimar, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.