BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

This is an Agreement in which Contractor shall provide regularly scheduled preventative maintenance and repair services on Chiller Plant Systems and Cooling Towers for the California Department of Corrections and Rehabilitation (CDCR), Richard J. Donovan Correctional Facility (RJD), located at 480 Alta Road, San Diego, CA 92179. The Agreement will be executed only upon the State's acceptance of the Contractor certificates of insurance, bonds, licenses, and permits, when such items are required. Should the Contractor fail to commence work at the agreed-upon date and time, the State, upon five (5) days written notice to the Contractor, reserves the right to terminate the Agreement. The Agreement term is July 1, 2023 or Upon Approval, whichever occurs last through June 30, 2026. Contractor shall provide the tasks listed below. Each task shall be accomplished on the specified equipment at the specified interval. Specific tasks may be modified for the convenience of either party however, such changes shall only be made with the consent of both parties in accordance with the Agreement and in writing. Contractor and/or Contractor's experienced field service technicians shall provide scheduled maintenance of the Chillers, Cooling Towers and associated equipment to include all consumable and Building Automation System (BAS) items with date and times to be mutually agreed upon by the State and Contractor. Through Spectrograph analysis of oil and High Voltage testing of the motor, Contractor shall provide preventative maintenance to ensure the health of the chillers and will report to the State the results of oil analysis and High Voltage Test along with any recommended corrective actions if needed On an as-needed basis and/or during regular scheduled maintenance, Contractor shall investigate, troubleshoot and make any necessary incidental repairs to the Chillers or Cooling Towers and associated equipment necessary to ensure proper operation of the cooling system and associated equipment and controls. Contractor shall receive approval from the Institution Contract Liaison or designee prior to commencing repair work on the Chillers and Cooling Towers. Letters of Inquiry May 18, 2023

Post-Bid

Jails / Prisons

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
21
Bidding Soon
429
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 1, 2023

img_map_placeholder

480 Alta Rd, San Diego, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.