BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Boulder, Colorado. Completed plans call for site work for a road / highway.

This Request for Documented Quotations (DQ) is issued by the State of Colorado, acting by and through the Department of Natural Resources, Division of Reclamation, Mining and Safety (DRMS). Enclosed is a brief description and bid schedule for the Lickskillet Mine Closure Project. The project work will include safeguarding thirty-eight (38) features; including nine (9) stopes, seventeen (17) shafts and twelve (12) adits. Closure methods will include machine and hand backfill, grating, grating with bat ladders and access, corrugated steel pipes and bulkhead with access. The work is on private property, Boulder County Open Space and property managed by the Bureau of Land Management (BLM). Sediment controls are required for all machine backfilled closures as directed by the PROJECT MANAGER. Project Location : The project is located fifteen (11) miles west of Boulder, Colorado. Access to the site is from Sunshine Canyon Drive to Gold Hill. Please see attached maps for project location. A Performance and Payment bond is required if the amount bid is $150,000.00 or greater. The CONTRACTOR shall furnish a labor and material payment bond for 100 percent of the original contract price and a performance bond for 100 percent of the original amount of the contract. The bonds are required by State Law, Title 24-105, 202-203, C.R.S., as amended. The bonds shall be submitted using the State forms. A certified or cashier's check or bank money order may be accepted in lieu of the bonds. If a surety other than a bond is used, the State will hold fifty percent (50%) of the surety until the final settlement date and fifty percent (50%) for six (6) months after the final settlement date.

Award

Roads / Highways

$124,789.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
50
Bidding Soon
933
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2023

June 1, 2023

img_map_placeholder

Sunshine Canyon Dr, Boulder, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.