Site work for a mixed-use development in Muskegon, Michigan. Completed plans call for site work for a educational facility; and water / sewer project.

PURPOSE Muskegon Community College is seeking and accepting proposals from qualified Contractors for the delivery and installation pursuant to the specification attached to this RFP. The existing below grade heating and chilled water piping, that supplies each for the Stevenson Center, requires replacement. Currently there is a temporary heating supply and return that connects the heating system to the facility. Project location - Muskegon Community College (MCC) Main Campus, 221 South Quarterline Road, Muskegon, Michigan, 49442. B. BACKGROUND MCC was founded as Muskegon Junior College 1926 and has been continually accredited by the Higher Learning Commission of North Central Association since 1929. MCC moved to its current campus location, an Alden B. Dow designed facility that opened to the public in 1967. In 1995, the Stevenson Center for Higher Education opened, comprising a consortium of Ferris State University, Grand Valley State University, and Western Michigan University, designed to increase access to educational opportunities for Muskegon residents. In 2010 the Outdoor Learning Lab, a focal point of green technology and center for MCC's new Alternative and Renewable Energy certificate program opened. MCC is currently located on a 111-acre campus in Muskegon, with extension centers in Fremont, Grand Haven, Newaygo, and Whitehall. In 2013, MCC received approval and funding for a construction and renovation project involving four major areas that include: Science, Technology, Engineering, and Math (STEM) Center, MCC Muskegon Downtown Center, Health, and Wellness Education Center, and a Creative and Performing Arts Center. According to MCC President, Dr. Dale Nesbary, "Muskegon Community College needs to compete on a national and global level. In addition to meeting crucial student needs, this expansion will also benefit employers and the community at large. It will help attract and retain talented individuals and equip them with the science skills to make them both more effective employees and informed residents, critical to improving the overall health of our communities. Moreover, MCC's growth from approximately 2,000 in the mid-1960s to approximately 5,000 credit-bearing students has led to the need for additional academic space in the STEM fields." Contractor Questions or Clarifications. If any Contractor contemplating submitting a proposal is in doubt as to the true meaning of any part of this RFP, it may submit to MCC a written request for an interpretation thereof. No oral explanation or instruction of any kind or nature whatsoever given before the award of a contract to a contractor shall be binding. All inquiries regarding this proposal must be written and should be submitted to: Muskegon Community College Attn: Mike Council Subject: Muskegon Community College Stevenson Center Heating and Chilled Water Piping Replacement Project mike.council@muskegoncc.edu REQUIRED SERVICES & EXPECTATIONS 1. Delivery and Installation. Muskegon Community College is a smoke free, tobacco and weapons free campus. The Contractor will work pursuant to the specifications attached in the RFP, project specifications, schedule, and drawings for the project, provided by BMA Architects and Ability MEP. All planned installation - delivery, demolition, installation services and startup will be performed during normal campus working hours that match applicable requirements of Muskegon Community College. Monday - Friday 7am - 5pm. There will be no holiday or weekend access unless specifically approved by the MCC Office of Physical Plant. For hours not listed or described herein, the contractor will provide a request for access to the Office of Physical Plant to review, plan and approve hours outside of the regular business day. Delivery, demolition, removal, assembly, and installation shall be performed by the contracted party. This project is not subject to Michigan prevailing wage requirements. The contracted party will be responsible for all permits and inspections as required. To ensure there is no conflict with the delivery of items the contractor shall coordinate the delivery date, delivery location, and installation schedule of items with the College's contract administrator prior to first delivery date. All transportation, delivery, installation, and disposal arrangements shall be the responsibility of the Contractor. The contractor shall have complete responsibility for supplies, items, and equipment until they are delivered, unpacked, and installed at all sites defined therein. The College does not have long-term storage facilities (shipping and receiving) and shall not accept items prior to delivery unless expressly noted during the RFP submission and authorized by the College. The College will provide locations for parking, within 500 ft for daily parking of five - seven contractor vehicles. Dumpster space is available within 1000 ft. in the northwest parking lot, adjacent to the work area. Contractor is required to clean asphalt, concrete, roadways, parking lots, and adjoining areas of all trash, dirt, sand, sediment, materials, packing waste and debris during the project and post project cleanup with a scheduled walkthrough with MCC Office of Physical Plant. Contractor will move concrete road barricades from Shipping and Receiving corridor to parking area(s) adjacent to Automotive building. Completed post project, if concrete barricades are determined to be needed during project. The College will work with the Contractor to provide project workspace for system programming, staging, and materials for the project's duration. Contractor will be responsible for all construction separation fencing, temporary signage, cones, barricades, and applicable measures to ensure a safe jobsite for the duration of the project until completion. Contractor Questions or Clarifications. If any Contractor contemplating submitting a proposal is in doubt as to the true meaning of any part of this RFP, it may submit to MCC a written request for an interpretation thereof. No oral explanation or instruction of any kind or nature whatsoever given before the award of a contract to a contractor shall be binding. All inquiries regarding this proposal must be written and should be submitted to: Muskegon Community College Attn: Mike Council Subject: Muskegon Community College Stevenson Center Heating and Chilled Water Piping Replacement Project mike.council@muskegoncc.edu

Award

Water / Sewer

$282,942.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
30
Bidding Soon
399
All Active Projects
168
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

221 Quarterline Rd, Muskegon, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.