BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and new construction of a mixed-use development in Glastonbury, Connecticut. Design plans call for the construction of a municipal facility; and for site work for a municipal facility.

Update: The existing animal control shelter was constructed in 1969. The building, kennels, and cages are now severely outdated and in need of substantial repair. Drainage issues have been identified and caused the animal control shelter to recently fail a state inspection. The recommendation is to raze the existing structure and construct a modern, functional facility. FY 2025 adopted budget moves the approved FY 2023 project from ARPA fund to Capital Reserve fund due to potential time constraints with the ARPA grant obligation deadline of December 31, 2024. The estimated cost to construct a new Animal Control Facility has increased from approximately $950,000 to $3.5 million. This increase is due to higher-than-anticipated construction costs, a commitment to building a net-zero energy facility, and additional design and space requirements to meet operational needs. Given the current condition of the existing facility, decisive action is needed. We will continue to explore alternative construction methods and potential cost-sharing through regional partnerships to manage costs effectively while addressing critical facility needs. Project is included in Town of Glastonbury Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.newstimes.com/journalinquirer/article/glastonbury-ct-animal-control-renovation-20102114.php Glastonbury seeks STEAP grant for animal control facility upgrade to comply with state regulations _____________________ As of October 27, 2023, an architect has been selected and this project is in the design phase. It is anticipated bidding will commence and construction will start in 2024. This project is included in the Town of Glastonbury's FY 2024 - FY 2028 CIP. Raze and replace existing shelter with modern, functional, code compliant facility. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Municipal

$3,150,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
905
Active Projects
362
Bidding Soon
7,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

To Be Determined, Glastonbury, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.