BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Fort Scott, Kansas. Completed plans call for the renovation of a playground / park / athletic field.

**As of May 18, 2023, project is on hold. No definite date for the rebid.** This project shall consist of the construction of an ADA accessible Bathroom and Shower House with 8" CMU blocks, metal roofing, concrete flooring, and all other work and appurtenances necessary to complete the project. 1.Remove Existing Structures-lump Sum 2.Bathroom (8' Cmu Block) (Complete)-lump Sum 3.Shower House (8" Cmu Block) (Complete)-lump Sum he LUMP SUM bid items will include the following: Design based on IBC 2015 - with minimum wind design speed of 120 mph Roof Snow Load - minimum 20 psf Roof - 24 Gauge standing seam metal roofing on wood or steel frame truss as designed, provided and installed by Contractor Insulation 1. Walls - R-19 2.Roof - R-30 Metal Roof Pitch - 2/12 City to approve final location of all proposed buildings Interior - All interior plumbing fixtures/fittings, electrical fixtures/wiring, and interior doors shall be specified, provided and installed by the Contractor with preapproval of materials by the City Contractor to supply and install 2 - two-inch (2") metal conduits under slab to interior of each building for electrical service Existing structures that may be present within project site shall be removed by Contractor prior to beginning other items of work Concrete for the concrete flooring will be 6-inch concrete over 6-inch AB-3 aggregate base on 6-inch leveled and compacted subgrade Sealers for the buildings shall be approved by the City prior to beginning work CMU Walls - Sealed with Loxon Water Blocking Primer/Finish (2 coats) or approved equal Concrete Floors - Sealed with H&C ClariShield Water-Based Wet Look Sealer (after cure) or approved equal All areas of disturbed soil shall be smoothed and seeded by the Contractor at some time after substantial completion and before final acceptance of work Contractor is responsible for any damage to the existing site caused by their work at the Project Site and will repair any damage at no cost to the City

Bid Results

Playgrounds / Parks / Athletic Fields

$295,689.00

Public - City

Renovation

4

8

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
43
Bidding Soon
651
All Active Projects
256
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2023

November 18, 2023

img_map_placeholder

1010 Park Ave, Fort Scott, KS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.