Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Genoa, Illinois. Completed plans call for the renovation of a 17,500-square-foot educational facility.
Estimated budget: $420,000-$520,000 for Elem School and $120,000 -$150,000 for High School Project Title Genoa-kingston Cusd #424 Elementary School Re- Roofing / Mechanical Upgrades & High School Eifs Project. Bid Guarantee Bid Security, in the Amount of 5% of the Bid, is Required in the Form of a Bid Bond. Performance Bond a Performance Bond and Labor and Material Payment Bond is Required in the Amount of 100% of the Contract. Rejections of Bids the Owner Reserves the Right to Accept or Reject Any and All Proposals and to Waive Technicalities. Withdrawal of Bid No Proposal May Be Withdrawn Within 30 Days After the Actual Date of the Opening Thereof. Bidders Qualifications All Bidders Must Complete in Full the Attached Contractors Qualification Statement (Aia Document A305) to Be Submitted With the Bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Location- GKSD Elementary School 602 E. Hill Street, Genoa, Illinois 60135 GKSD High School 980 Park Avenue, Genoa, Illinois 60135 All questions are to be emailed to Mark Kehely at Hagney Architects - E-Mail MarkK@HagneyArchitects.com. 815 397-3330 1. Hagney Consultants: OAS Mechanical & Electrical, Keith O'Higgins- E-Mail kohiggins@oasllc.net 630-538-1996 2. Owner's Representative: Is on Vacation. a) Mr. Joe Ratliff, Director of Operations (jratliff@gkschools.org) a. Repairing, reworking existing EIFS ledge line to brick line. b. Cleaning the existing EIFS surfaces areas before re-skinning the original surface with new finish. c.Alternate A-3: Removing and replacing all EIFS control joints and backer rods. d.Alternate A-4: Removing and replacing all brick veneer sealant control joints and backer rods. e.Alternate A-5: Removing and replacing all sealant beads around all existing windows and doors. f. Allowance 3A: For quantity of 200' linear feet of 2" d x 12"h of possible moisture damaged EIFS base wall panel to be included in base bid. g.Unit Price No. 3: Removal and replacement of possible damaged EIFS wall panel for unit cost per 2"d x 12"h x 10'-0" linear feet. a. New exterior RTU serving existing gymnasiums, including the demolition of existing in-house mechanical building systems for this area. b. Replacing the current exterior RTU serving existing cafeteria and library, c. Replacing the current split units and replacing with two smaller RTU's d. GKSD CUSD #424 Has already purchased both the RTU's. Units to be delivered to the GKSD Elementary School Site. e. Removing and reinstalling existing exhaust fan hoods after installing new roof curb units. Allowing roofing sub-contractor curb work has been completed. f. Removing and reinstalling some of the current exhaust fans after roofing sub-contractor curb work has been completed. g. Alternate A1: Removing and providing new skylights with new curb units at 9 locations. h. Alternate A2: Removing existing skylights and curbs, than infilling with new metal decking and rigid roof insulation material. i. Allowance 1A: For quantity of 1,000 sq. ft x 1" in depth of New rigid board polyiso insulation to be included in the base bid. j. Allowance 2A: For quantity of 300'-0" linear feet of 2 x 8 wood blocking to be included in base bid. k.Unit Price No. 1: Removal and replacement of possible water damaged insulation for unit cost per 12" x 12" x 1" square foot. l. Unit Price No. 2: Removal and replacement of possible damaged 2" x 8" wood parapet edge blocking for unit cost per 10'-0" linear feet. m. New TPO roofing membrane along with additional rigid roof insulation phase one of two to be completed this summer the remaining work scheduled for Summer of 2024. he Work of Project is defined by the Contract Documents and consists of the following two site locations with-in GKSD: Site Location #1 Genoa Kingston Elementary School. Located at 602 East Hill Street. a) Re-Roofing, Mechanical upgrades and (New skylights - Alternate A-1) and (Skylight Demo with metal deck infill - Alternate A-2) at Genoa Kingston Elementary School. The current facility consistence of 48,8500 sq. ft. of this roofing area. The scope of work will consist of 17,500 sq. ft of re-roofing and mechanical upgrades work. Site Location #2 Genoa Kingston High School. Located at 980 Park Avenue. a) EIFS Adjustment and new finish color, including the replacement of all existing expansion control joints and replacement of existing sealant beads around windows, door and other mechanical / wall penetrations.
Award
Educational
$929,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2023
June 3, 2023
Multiple Locations, Genoa, IL
Related To This Project
Genoa, IL
Bid Date: Jun 03 2021
Genoa, IL
Bid Date: Mar 11 2021
Genoa, IL
Bid Date: Jan 06 2022
Genoa, IL
Bid Date: Mar 22 2019
Genoa, IL
Bid Date: Oct 20 2023
Genoa, IL
Bid Date: Nov 15 2023
Genoa, IL
Bid Date: Mar 07 2024
Genoa, IL
Bid Date: Apr 05 2024
Genoa, IL
Bid Date: Apr 06 2023
Genoa, IL
Bid Date: Oct 26 2020
Genoa, IL
Bid Date: Oct 27 2021
Genoa, IL
Bid Date: Apr 26 2022
Channahon, IL
Bid Date: Apr 04 2023
Willow Springs, IL
Bid Date: Apr 13 2023
Charleston, IL
Bid Date: Apr 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.