BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Chino Valley, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of April 28,2023 project was awarded to CLM Earthmovers, LCC, awarded amount is $4,321,876.25.** Construction work, in general, consists of furnishing all labor, materials, equipment, and services for the reconstruction of the following roadway segments: Cantfield Ave between W Perkinsville Rd and end of cul-de-sac (3 inch AC) Taylor Ave between W Perkinsville Rd and end of cul-de-sac (3 inch AC) Campbell Ave between W Perkinsville Rd and end of cul-de-sac (3 inch AC) E Rd 1 South between SR-89 and S Road 1 East (4 inch AC / 9 inch AB) S Rd 1 East between Fletcher Ct and E Rd 3 South (4 inch AC / 9 inch AB) including new 18 inch sewer main with appurtenances The estimate of probable cost is $3.5M - $4.5M All bidders desiring to prepare a responsive bid shall submit a non-revocable bid security payable to the Town in the amount of ten percent (10%) of the total bid price per the contract documents. The Town reserves the right to reject any or all bids, waive any informality in a bid or to withhold the award for any reason the Town determines. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/31/2023 at 5:00 PM MT Questions during the bidding process shall be directed to Steve Sullivan, Assistant Town Engineer by email at ssullivan@chinoaz.net no later than Friday

Award

Roads / Highways

$4,321,876.00

Public - City

Paving, Site Work

53

3

1

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
15
Bidding Soon
225
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

May 11, 2023

img_map_placeholder

Multiple Locations, Chino Valley, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.