Site work for a water / sewer project in Fitchburg, Wisconsin. Conceptual plans call for site work for a water / sewer project.
As of August 23, 2024, it is expected that design work will take place in 2025 and construction will begin in 2026. Regional stormwater study, design, and construction for the area including TID #9 boundary area near Lacy/Seminole and south of boundaries (Obrien's) . Per North Stoner Prairie Neighborhood Plan (Appendix H, Conceptual Stormwater Management Plan), part of TID 9 north of Lacy has the potential to discharge to Obrien farm to the southwest of Lacy/Seminole, which is part of an enclosed depression. In addition to TID 9, there is a large drainage area (both urbanized and rural) feeding into to this enclosed depression. There is no natural outlet to this area. 2021-2030 CIP Update: Delay construction of drainage infrastructure from 2022 to 2025. Change TID funding from cash to borrowing. 2020 - Perform a comprehensive drainage study of the area, with potential recommendations for pumping plans if needed, identification of potential drainage infrastructure, identification of retention areas, identification of low impact development techniques or recommended stormwater ordinance changes, or recommended conditions on development. TID #9 Amendment #2 includes 75% funding ($225,000 of $300,000 total). Remaining 25% to be paid through stormwater utility. 2025 (delayed from 2022) - Following a drainage study of the area, construct recommended drainage infrastructure. Infrastructure could be potentially upstream of enclosed depression, within enclosed depression, or downstream. TID #9 Amendment #2 includes 75% funding ($2,393,000 of $3,190,100 total). Remaining 25% to be paid through stormwater utility. 2021-2030 CIP Council Amendment: Accelerate from 2025 to 2022/2023 2022-2031 CIP Update: Costs updated based on the results of the Feasibility Study completed in 2021 (available online here: http://www.fitchburgwi.gov/2679/Sub-Zero-Stoner-PrairieStormwater-Study). Project costs decreased from $3,190,100 to $1,703,900. Costs include Alternate A2 (A New Infiltration Basin Outside of the Sub-Zero Kettle) and Alternate B1 (Fixed Pumping Station). It is recommended that we put Alternate C2 (Low Flow Gravity Pipe - Kettle South of Lacy Road to the Sub Zero Kettle) on hold indefinitely. The kettle south of Lacy has not failed (meaning that it still infiltrates). If it fails in the future, Alternate C2 would be recommended at that time. In addition, the TIF-SW Utility split was updated based on the area served by Alternate A2 and B1, which is 94% within the TID boundary and 6% outside of that boundary. Project delayed from 2022/2023 to 2024/2025. 2022-203 As of January 23, 2024, this project is included in the City of Fitchburg's FY 2024 2033 CIP and funding is allotted for construction in 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,311,900.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
To Be Determined, Fitchburg, WI
Related To This Project
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Feb 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.