Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Lake Zurich, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
The work included will consist of Hot-Mix Asphalt removal (HMA), placement of HMA binder, HMA surface course, undercutting, class D patching, curb & gutter and sidewalk removal & replacement, drainage structure repair and installation, ADA compliance and other items. ILDOT - 2023 Road Program Lake Zurich - 23-00080-00-PV Project Location: Old Mill Grove Road and Adjacent Minor Streets Project Description/Key Points IDOT MFT Funded QC/QA material testing requirements IDOT Approved Mix Designs QC shall be included in all associated line items IDOT prequalification required All IDOT paperwork within bid documents necessary to submit with bid shall be in bid package submittal. -Includes BLR: 12200, 12201, 12230, 12325 -BC 57 -Signature of Receipt of all Addendums Underground Utility Work Point repairs of Storm Sewer Based on Televising- all connections incidental to length of pipe repaired. Point repairs of Sanitary Services based on Televising Point repairs of Water Main - see specifications for testing and chlorination requirements See JULIE in Appendix A of this Agenda for photos for approximate locations of existing utilities near proposed point repairs. Concrete 9000' of curb removal and replacement 13,906 SF sidewalk removal and replacement ADA compliant sidewalk - Contractor shall have at least one 4' smart level on site during concrete framing and pouring operations to confirm ADA compliance. ADA sidewalk forms shall be inspected minimum 24 hours prior to concrete pour unless same day framing and pouring is authorized by the Resident Engineer Resurfacing: 4" mill, 2.25" N50 binder, 1.75" Mix D N50 surface. Boring reports (attached as Appendix B) indicate varying thickness of asphalt. It is the intent of this project to ensure a minimum 6" of asphalt exist throughout. Additional milling may be requested and paid for using the percent change of thickness adjustments per IDOT SSRB 440.07. Alternatively, areas with insufficient remaining asphalt shall be patched utilizing the appropriate patching items. Roadway base items were included based on thin asphalt bores- specifically B4. It is possible these bores do not reflect actual field conditions; however roadway items were included to cover any subbase work required. See typical section for Construction Sequencing. Note that asphalt will need to be paved in two passes resulting in one longitudinal centerline joint. Pavers must be able to pave a 19' wide pass and include auger extensions per IDOT requirements. Structure frames in pavement shall be steel plated prior to asphalt milling. Paid for using adjustment pay items. Type 1 Structure frames located halfway in curb line and halfway in pavement shall be milled around
Post-Bid
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2023
May 12, 2023
Multiple Locations, Lake Zurich, IL
Related To This Project
Lake Zurich, IL
Bid Date: Apr 18 2023
Lake Zurich, IL
Bid Date: Apr 28 2023
Lake Zurich, IL
--
Lake Zurich, IL
Bid Date: Jun 06 2023
Lake Zurich, IL
Bid Date: Sep 05 2023
Lake Zurich, IL
Bid Date: Apr 02 2021
Lake Zurich, IL
Bid Date: Aug 03 2023
Lake Zurich, IL
Bid Date: Mar 11 2020
Lake Zurich, IL
Bid Date: Mar 02 2023
Lake Zurich, IL
Bid Date: Mar 15 2023
Lake Zurich, IL
Bid Date: Feb 23 2023
Lake Zurich, IL
Bid Date: Feb 03 2023
Lake Zurich, IL
Bid Date: Mar 23 2023
Lake Zurich, IL
Bid Date: Mar 16 2023
Lake Zurich, IL
Bid Date: Feb 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.