EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Lake Zurich, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The work included will consist of Hot-Mix Asphalt removal (HMA), placement of HMA binder, HMA surface course, undercutting, class D patching, curb & gutter and sidewalk removal & replacement, drainage structure repair and installation, ADA compliance and other items. ILDOT - 2023 Road Program Lake Zurich - 23-00080-00-PV Project Location: Old Mill Grove Road and Adjacent Minor Streets Project Description/Key Points IDOT MFT Funded QC/QA material testing requirements IDOT Approved Mix Designs QC shall be included in all associated line items IDOT prequalification required All IDOT paperwork within bid documents necessary to submit with bid shall be in bid package submittal. -Includes BLR: 12200, 12201, 12230, 12325 -BC 57 -Signature of Receipt of all Addendums Underground Utility Work Point repairs of Storm Sewer Based on Televising- all connections incidental to length of pipe repaired. Point repairs of Sanitary Services based on Televising Point repairs of Water Main - see specifications for testing and chlorination requirements See JULIE in Appendix A of this Agenda for photos for approximate locations of existing utilities near proposed point repairs. Concrete 9000' of curb removal and replacement 13,906 SF sidewalk removal and replacement ADA compliant sidewalk - Contractor shall have at least one 4' smart level on site during concrete framing and pouring operations to confirm ADA compliance. ADA sidewalk forms shall be inspected minimum 24 hours prior to concrete pour unless same day framing and pouring is authorized by the Resident Engineer Resurfacing: 4" mill, 2.25" N50 binder, 1.75" Mix D N50 surface. Boring reports (attached as Appendix B) indicate varying thickness of asphalt. It is the intent of this project to ensure a minimum 6" of asphalt exist throughout. Additional milling may be requested and paid for using the percent change of thickness adjustments per IDOT SSRB 440.07. Alternatively, areas with insufficient remaining asphalt shall be patched utilizing the appropriate patching items. Roadway base items were included based on thin asphalt bores- specifically B4. It is possible these bores do not reflect actual field conditions; however roadway items were included to cover any subbase work required. See typical section for Construction Sequencing. Note that asphalt will need to be paved in two passes resulting in one longitudinal centerline joint. Pavers must be able to pave a 19' wide pass and include auger extensions per IDOT requirements. Structure frames in pavement shall be steel plated prior to asphalt milling. Paid for using adjustment pay items. Type 1 Structure frames located halfway in curb line and halfway in pavement shall be milled around

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

3

19

95

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Shoring and Underpinning, Concrete Raising, Pressure Grouting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
152
Bidding Soon
2,724
All Active Projects
1,175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2023

May 12, 2023

img_map_placeholder

Multiple Locations, Lake Zurich, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Road Program Lake Zurich

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.