EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Sacramento, California. Completed plans call for the renovation of a educational facility.

Scope of Work including but not limited to: Removal and replacement of existing roofing system. New rigid and tapered insulation under new roofing system. New flashings. Removal and replacement of rain-water leaders. Misc. sheet metal replacement. Replacement of flex whips on HVAC units. Coat existing rooftop ductwork with weather protectant coating. Notice is hereby given that the Project is a public works project within the requirements of Division 2, Part 7, Chapter 1 of the California Labor Code, and that each bidder and listed subcontractor is required to be registered pursuant to Labor Code section 1725.5 at the time of bidding. Failure of the bidder to be registered at the time of bidding shall render the bid non-responsive and unavailable for award. Bidder's listing of an unregistered subcontractor may render the bid nonresponsive and unavailable for award unless such failure is the result of an inadvertent error and the provisions of Labor Code section 1771.1 apply Overall coordination of the Project will be the responsibility of the District Representative. All inquiries regarding the bid are to be directed to Facilities Business Department, FacilitiesBusiness@sanjuan.edu, Maria Mahon - Procurement Analyst, maria.mahon@sanjuan.edu and cc: Meredith Collins, ICS - District representative, meredith@icscm.com. Contracts for construction will be direct prime contracts with the District. All Project procedures and documents are designed to facilitate delivery of the Project through prime construction contracts. The District's forms shall be used for all documents. Bidders shall read and review the Bidding Documents carefully, and shall familiarize themselves thoroughly with all requirements Each bid proposal shall conform to the requirements of the Contract Documents. The bid documents will be emailed to all attendees of the mandatory pre-bid walk The governing board of the District reserves the right to reject any and all proposals and to waive any irregularity in any proposals received. At the request and expense of the successful Bidder, eligible securities shall be accepted in lieu of retention payments to insure performance under the Contract, pursuant to California Public Contract Code Section 22300. Refer to Exhibit H and General Conditions Section 00 72 00, Article 12, Section 12.05. Said securities shall be deposited prior to the submission of the successful Bidders first progress payment application. The District participates in all available rebate programs. The successful Bidder agrees to notify the District of any available rebate of which the successful Bidder is aware, and to provide the District with invoices and all other documentation necessary to claim any available rebate. The District will apply for available rebates, and the rebates will be paid directly to the District, not the successful Bidder. The successful Bidder shall have at least one supervising technician on call in the event that the existing fire alarm, security clocks, intercom, telephone and data systems are damaged during the course of construction or the Contract requires relocation of existing devices. The supervising technician is required to be on Site during all aspects of repair, modifications and testing. For fire alarm modifications and repairs the supervising technician is required to have at a minimum NICET LEVEL 2 Certification or equal. The District may consider optional Underwriters Laboratories Certification, factory training or contractor demonstrated equal experience/training with prior approval. The supervising technician must also have a minimum 5-years installation experience License required: B - General Building Contractor Engineers Estimate: $1,900,000

Award

Educational

$2,190,000.00

Public - County

Renovation

18

18

24

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Membrane Roofing, Thermoplastic Membrane Roofing, Polyvinyl-Chloride Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Manufactured Gutters and Downspouts, Reglets, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceramic Tiling, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Clocks, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, Flexible Ducts, HVAC Fans
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Fill, Backfill, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
84
Bidding Soon
1,589
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

June 5, 2023

img_map_placeholder

1400 Bell St, Sacramento, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Encina HS Re-Roofing

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.