Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2023 at 8:00 PM
Updated November 9, 2024
Site work and paving for a road / highway in Butler, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The work included in this project is as follows: - PERMEABLE PAVERS/ CONCRETE / ASPHALT: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Pavement Sawing - 1,343 LF, Remove Driveway Pavement - 32 SY, Pavement Removal, Excavation & Grading - 1,473 CY, Excavation Below Subgrade - 191 CY, Dense Graded Base (1-1/4") - 1,873 TON, Dense Graded Base (3/4") - 8 TON, Dense Graded Base (3") - 438 TON, Bit. Concrete Surface (5 LT 58-28 S) - 314 TON, Bit. Concrete Binder (3 LT 58-28 S) - 600 TON, 12" Storm Sewer CIPP Lining - 138 LF, 4" Dia PVC Underdrain - 276 LF, 4" Dia PVC Storm Sewer - 34 LF, Storm Sewer Cleanout - 2 EA, Permeable Pavers - 994 SF, No. 2 Stone - 166 TON, No. 9 Stone - 13 TON, No. 57 Stone - 70 TON, Pavement Marking, Epoxy, Yellow, 4-inch - 132 LF, Valve Adjustment - 1 EA, 7" Concrete Driveway - 32 SY, 7" Concrete Pavement - 405 SY \ : Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Pavement Sawing - 1,343 LF, Remove Driveway Pavement - 32 SY, Pavement Removal, Excavation & Grading - 1,411 CY, Excavation Below Subgrade - 225 CY, Dense Graded Base (1-1/4") - 2,149 TON, Dense Graded Base (3/4") - 8 TON, Dense Graded Base (3") - 516 TON, Bit. Concrete Surface (5 LT 58-28 S) - 370 TON, Bit. Concrete Binder (3 LT 58-28 S) - 707 TON, 12" Storm Sewer CIPP Lining - 138 LF, Pavement Marking, Epoxy, Yellow, 4-inch - 132 LF, Valve Adjustment - 1 EA, 7" Concrete Driveway - 32 SY \ Bids shall be accompanied by Bid Security in the form of a bid Bond, certified check, or cashiers check made payable to the Village of Butler in an amount of 5 percent (5%) of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Check or Bid Bond shall be forfeited to the Village as liquidated damages. \ Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. \ All bidders must file a "Bidders Qualification Statement," with the Village Clerk on or before 11:00 am on Friday, March 31, 2023 (unless already submitted for 2023). The Village reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid and Bids which best serve the interests of the Village. \ This advertisement is published by the authority of the Village of Butler, in accordance with Section 985.02(2) of the Wisconsin Statutes.
Bid Results
Roads / Highways
$712,259.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
