BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Lancaster, Pennsylvania. Completed plans call for site work for a water / sewer project.

CLARIFICATION DEADLINE 4/24/2023 12:00 PM Michael A. Sulpizio, PE, Project Manager RK&K 3501 Concord Road, Suite 130, York, PA 17402 717.840.3603 The SCOPE OF WORK to be performed under this contract consists of the furnishing of all material and the construction, complete in place, for the Lower Little Conestoga Interceptor Rehabilitation Project - Phase 4 including but not limited to: pipe rehabilitation, CCTV inspection, sewer cleaning, CIPP lining, manhole/structure rehabilitation lining, and all general requirements, appurtenances and incidental items of work as shown on the Drawings, specified in the Specifications or as directed by the Engineer. Bidding Documents may be examined without charge at the office of the Authority at the address shown above. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a government agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, or Bid bond (in the required form) for ten percent of the Bid total in the same fashion as all other submittals that are made with the Bid. The lowest responsible bidder shall submit the actual Bid security to the Authority within three (3) business days after bid opening. The LANCASTER AREA SEWER AUTHORITY hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, mistakes, defects or irregularities in any Bid. $4.5 Million to $5.5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion- 240Calendar Days

Award

Water / Sewer

$4,465,050.00

Public - County

Site Work

25

15

5

6

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
277
Bidding Soon
3,714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

July 10, 2023

Project location map

Multiple Locations, Lancaster, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.