BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2024 at 8:00 PM

Updated September 18, 2024

Site work and addition to a power facility in Longmont, Colorado. Conceptual plans call for the addition of a power facility; and for site work for a power facility.

Design and construction of an expansion to the Citys recently completed Renewable Natural Gas (RNG) system. The RNG project, completed in early 2020, included a biogas treatment process at the Citys Wastewater Treatment Plant (WWTP) and a new RNG fueling facility for the Citys Waste Services trucks. The existing RNG system has been treating biogas and fueling Waste Services vehicles successfully. The Waste Services group does not utilize all the available RNG produced at the WWTP, and there is additional capacity to fuel other City vehicles with RNG. This expansion will allow other City fleet vehicles to fuel with RNG. This project supports environmental stewardship, offsets the City's current fossil fuel usage with a renewable energy source and helps meet goals outlined in the Sustainability Plan and Climate Emergency Resolution. Design and construction of this project will take place depending on grant eligibility. The project funding source is preliminary until more detail with respect to which City vehicles will be utilizing the RNG. Final funding sources will be determined when grant funding has been secured. This project is shown as unfunded at this time. Staff will research grant and public/private partnership opportunities in order to secure funding, until and unless additional City funds become available. As of September 17, 2024, this project is in the City of Longmont Capital Budget FY 2024 - 2028 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Thermal Power Generation

$544,800.00

Public - City

Addition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
0
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

Project location map

To Be Determined, Longmont, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.