Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 27, 2025 at 7:00 PM
Updated February 28, 2025
Site work for a power facility in Longmont, Colorado. Conceptual plans call for site work for a power facility.
Update:https://longmontcolorado.gov/wp-content/uploads/2025/02/2025-29-Adopted-CIP-v5.pdf Expansion and enhancements to substations occur as a result of new growth and development. The necessary capacity additions are determined by analyzing the load trends, load forecasting, and development activities. With the predicted load forecast and the known development occurring in the southwest and southeast areas, it is anticipated that additional substation capacity in both areas will be required in the next few years. Capacity increases can include addition of new power transformers and Battery Energy Storage Systems (BESS). The funded amounts are for equipment to expand capacity from existing substations. Project is included in City of Longmont Fiscal Year 2025-2029 Page no 93 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Expansion and enhancements to substations occur as a result of new growth and development. The necessary capacity additions are determined by analyzing the load trends, load forecasting, and development activities. With the predicted load forecast and the known development occurring in the southwest and southeast areas, it is anticipated that additional substation capacity in both areas will be required in the next few years. Capacity increases can include addition of new power transformers and Battery Energy Storage Systems (BESS). The funded amounts are for equipment to expand capacity from existing substations. As of September 11, 2024, this project is in the City of Longmont's Capital Budget FY 2024-2028 CIP. Further information regarding a design firm or timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Power Plant
$4,711,161.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
To Be Determined, Longmont, CO
Related To This Project
Longmont, CO
Bid Date: Oct 03 2024
Longmont, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
